On 23 September 1940, McGuinness was seriously injured in a naval accident when his ship ran aground; McGuinness’ leg was broken when the ship’s tow cable snapped and he spent the next 11 months convalescing at Camp Hill Hospital in Halifax, Nova Scotia. While in hospital McGuinness contracted scarlet fever and diphtheria and developed osteomyelitis as a complication of his femur facture. McGuinness returned to Winnipeg to continue his convalescence at Deer Lodge Hospital and was ultimately discharged from the navy in 1941.
Scope and Content
Photograph shows Fred McGuinness in traction in a hospital bed, possibly at Camp Hill Hospital.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Farm wagons at Great Northern (BS&HB) station in Bunclody, Manitoba.
Notes
From the collection of Gilford Copeland of Bunclody, Manitoba
"Published under the auspices of the Agricultural Committee of the Greater Des Moines Chamber of Commerce with the cooperation of the Iowa State University Center for Agriculture and Economic Development."