Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant.
Notes
Writing on the back of the photograph reads: "10 mile dam". Biographical information obtained from Manitoba Historical Society.
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant. The dam's timber construction is quite evident in the picture.
Notes
Writing on the back of the photograph reads: McGuinness (Manitoba Hydro), on Little Saskatchewan.
A series of thirteen blueprints was prepared for the proposed new lecture building and theatre. Blueprints four and eleven are missing from this collection. Those included provide a plot plan for the buildings within the general campus and individual schedules showing various features of the new buildings.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
This consists of a series of five blueprints for the proposed new science building: third floor organic chemistry; second floor biology lab; two blueprints of first floor, advanced optics, general physical laboratory; basement.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
This consists of a series of four blueprints for the proposed new science building: third floor organic chemistry; second floor biology lab; first floor, advanced optics, general physical laboratory; basement.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents