See RG 6 Brandon University fonds, 7.4.1 Dean of Music for biographical information.
Custodial History
The records were collected during the course of Jones' career as a member of the School of Music and as Dean of the School of Music. They remained in his possession until their donation to the McKee Archives on June 29, 2011.
Scope and Content
Collection consists of records created and collected during the course of Lawrence Jones' teaching career in the School of Music and during his tenure as Dean of the School of Music at Brandon University.
Records include: dean's log books; recital programs and related materials; personal documents; academic papers; planning documents; contracts; administration documents; workshop documents; teaching documents; proposals; reviews; evaluations; violin concerto by S.C. Eckhardt-Gramatte, piano score, edited by Lawrence Jones. Topics include: planning for the School of Music; Master's degree program; award winners; the music building expansion; adjudicating; the New Brandon University Trio; and the National Music Festival.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of Canadian Pacific (foreground) and Great Northern (background) railway yards, as well as Great Northern station in Brandon, Manitoba.
Notes
Shows a 500 series F-1 class 2-8-0 engine switching
Published in Canadian Rail, August 1975
Buildings that are visible in this photo, but now gone (1987), include Codvilles, Western Grocers (Burbridge Saddlery), John E. Smith Block, Federal building, City Hall, and the Prince Edward Hotel [Fred McGuinness collection (20-2009)].
[This copy negative was produced using a previously published image. P.E. 30/07/09]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station in Brandon, Manitoba.
Notes
[Looking southeast; Pacific Avenue was located directly north (left) of the station and tracks. P.E. 30/07/09]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
This engine was built by Brooks in March of 1883 as No. 887 and marked as scrap [by the GN] in 1937. This engine is known to have worked passenger trains to Brandon. This class of locomotive was replaced by gas-electric [power units] in 1929 but they would be used if no gas-electric was available. Engine 185 sat dead in Minot from the closing of the Brandon line until it was scrapped.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Engine 185, a class B-19 4-4-0 ["American"] type at Minot, ND.
Notes
Small copy neg. Quote in HistoryBio taken from Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern [gas-electric power unit] 2327 & Train at Rugby, ND.
Notes
Built by Brill/Westinghouse in June of 1928; scrapped June 1956. This unit ran with a similar train to Brandon, Manitoba from 1929 until 1936.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern wedge snowplow on ore gondola, Minot, ND.
Notes
From the collection of George H. Harris, Winnipeg, Manitoba.
Stuckey and Bain (1996, p. 21) note that "Built in the company shops, simply by adding a plow to an ore jenny which was filled with rocks, these vehicles were quite effective at removing snow from single tracks."
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Remnants of Great Northern Railway, Hebron, Manitoba. Visible features include the former Great Northern (BS&HB) Railway grade with tie indents, as well as concrete foundation blocks that may have been used for a coal dock.
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put two negatives and two prints in the same envelope. We have separated them, numbering the negatives PE28(1) and PE28(2), and the respective prints PE28(1a) and PE28(2a).
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Remnants of Great Northern Railway, Hebron, Manitoba. Visible features include the former Great Northern (BS&HB) Railway grade with tie indents, as well as concrete foundation blocks that may have been used for a coal dock.
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put two negatives and two prints in the same envelope. We have separated them, numbering the negatives PE28(1) and PE28(2), and the respective prints PE28(1a) and PE28(2a).
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Remnants of Great Northern Railway, Hebron, Manitoba. Visible features include the former Great Northern (BS&HB) Railway grade with tie indents, as well as concrete foundation blocks that may have been used for a coal dock.
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put two negatives and two prints in the same envelope. We have separated them, numbering the negatives PE28(1) and PE28(2), and the respective prints PE28(1a) and PE28(2a).
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Remnants of Great Northern Railway, Hebron, Manitoba. Visible features include the former Great Northern (BS&HB) Railway grade with tie indents, as well as concrete foundation blocks that may have been used for a coal dock.
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put two negatives and two prints in the same envelope. We have separated them, numbering the negatives PE28(1) and PE28(2), and the respective prints PE28(1a) and PE28(2a).
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station at Boissevain, Manitoba.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway freight shed, Brandon, Manitoba.
Notes
Office end (foreground) razed 1984; remainder demolished January 8, 1986.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway Weed Burner, Rugby, ND.
Notes
The Great Northern used the same unit on its line to Brandon.
Box contains minutes geenrated by local MPE associations, collected and microfilmed by the central office. Rolls in this box include the following:
Roll 13: Oakbank 1940-51; Oakburn 1940-51; Oak Lake 1928-51; Oakland 1928-51; Oakville 1928-51; Osbourne 1927-51; Rapid City 1926-51; Pierson 1928-51; Pilot Mound 1928-51; Pipestone 1929-51; Poplar Point 1947-51; Portage 1927-51; Purves 1928-51
Roll 14: Rapid City 1926-27; Rathwell 1928-51; Regent 1927-51; Reston 1927-51; Rhodes 1928-48; Riverton 1948-51; Sandy Lake 1943-51; Selkirk 1947-51; Roblin 1926-51; Rossburn 1929-51; Roundthwaite 1928-51; Russell 1940-51; Ste Agathe 1946-51; St Jean 1949-51; Sanford 1927-51; Scrick 1944-51
Roll 15: missing
Roll 16: Starbuck 1927-40; Stonewall 1939-51; Strathclair 1947-51; Swan Lake 1928-51; Teulon 1940-51; Thorn Hill 1926-51; Tilston 1928-51; Treherne 1928-51; Vista 1940-51; Warren 1947-51; Waskada 1925-51; Wawanesa 1927-51; Wood Bay 1937-51; Wood Bay 1926-37; Wood North 1928-51
Roll 17: Side 1 Alexander to Birdtail Oct 1951 – June 1957; Side 2 Birnie to Cartwright Oct 1951 – June 1957
Roll 18: Side 1 Chillon to Ebor Oct 1951 – June 1957; Side 2 Eden to Fork River Oct 1951 – June 1957
Roll 19: Side 1 Forrest to Hamiota Oct 1951 – June 1957; Side 2 Harding to Kronsgart Oct 1951 – June 1957
Roll 20: Side 1 Landseer to Maples Oct 1951 – June 1957; Side 2 Margaret to Napinka Oct 1951 – June 1957
Roll 21: Side 1 Neelin to Purvis Oct 1951 – June 1957; Side 2 Rapid City to Silverton Oct 1951 – June 1957
Roll 22: Side 1 Sinclair to Warren Oct 1951 – June 1957; Side 2 Waskada to Woodnorth Oct 1951 – June 1957
This box contains minutes generated by local MPE associations, collected by the central office. Records include the following:
79a. Cromer 1978-1980
79b. Cromer 1977-1978
80a. Dauphin 1977-1978
80b. Dunrea 1977-1980
81a. Gladstone March 1 1979 – Nov 24 1980
81b. Gladstone Feb 2 1977 – Jan 17 1979
82. Edwin Jan 10 1977 – March 3 1981
83a. Isabella Feb 4 1977 – August 28 1980
83b. Lauder April 20 1979 – Nov 13 1980
84. Lyleton Dec 13 1977 – Nov 24 1978
85a. Jordan April 2 1979 – Dec 11 1980
85b. Jordan Jan 31 1977 – Feb 26 1979
86. Moore Park Jan 4 1977 – April 11 1979
87a. Napinka Jan 17 1977 – Nov 14 1980
87b. Nesbitt Feb 8 1979 – Nov 27 1980
87c. Nesbitt Jan 6 1977 – Dec 18 1978
87d. Ninga Feb 16 1977 – July 28 1980
88a. Pierson Dec 20 1978 – Nov 26 1980
88b. Pierson Jan 20 1977 – Dec 20 1978
89a. Souris Jan 10 1975 – Nov 30 1976
89b. Sperling May 8 1978 – Dec 10 1980
89c. Sperling March 21 1977 – Jan 31 1979
90. Tilston June 9 1977 – Nov 16 1978
91. Waskada Jan 10 1977 – Dec 12 1980
92. Bradwardine Feb 11 1981 – Nov 16 1981
93. Cromer Jan 13 1981 – Nov 27 1981
94a. Dunrea Sept 23 1985 – Nov 27 1989
94b. Dunrea March 24 1981 – Feb 14 1985
95a. Beresford July 31 1986 – Nov 14 1986
95b. Beresford Jan 13 1981 – April 3 1986
96a. Gladstone Nov 19 1986 – Nov 28 1989
96b. Gladstone Nov 3 1983 – Oct 11 1986
96c. Gladstone Jan 23 1981 – Jan 4 1984