Photograph shows members of the Brandon University Foundation during a tour of the construction site. Members include: Scott Stewart, Doug Adams, Sheri Decter-Hirst.
Photograph was taken from the basement looking up and shows support beams, two outer walls covered in vapor barrier plastic, some windows and the missing roof.
Photograph was taken from the basement looking up and shows support beams, an outer wall covered in vapor barrier plastic, some windows and the missing roof. The windows may be part of one of the stairwells.
Photograph was taken from inside the building looking out onto the courtyard. It shows scaffolding around the hole in the wall that would become the rear entrance to the Brandon College Building and Clark Hall.
Photograph shows construction on the basement of the Brandon College Building and Clark Hall, including support beams, concrete walls, mounds of dirt and a number of workers.
Photograph shows what appears to be a flood in one of the hallways of the Brandon College Building and Clark Hall after the interior walls had been framed out.
Photograph of a proposed model for the Brandon College and Clark Hall renovations. Model shows the courtyard, the link, the skywalk and the new rear entrance.
Photograph of a proposed model for the Brandon College and Clark Hall renovations. Model shows the link, the skywalk, the A.E. McKenzie Building and part of the George T. Richardson Centre.
Photograph of a proposed model for the Brandon College and Clark Hall renovations. Photograph is looking down on the model, which shows the link, the skywalk, west side of Clark Hall and the Original Building and the courtyard.