The University Calendar is the authoritative statement of the institutional structure, faculty and staff, and academic program of Brandon University. Since the creation of the College in 1900, calendars have been produced annually, with only a few exceptions, by the Registrar's Office.
Up until 1991-1992, the calendar was called the general calendar. In 1991-1992, it was called the undergraduate general calendar. Beginning in 1992, the calendar was produced every two years instead of annually, except for 1998-1999, until 2003. The 1992-1994 calendar contains both the undergraduate and graduate general calendars, and starting in 1994 a separate undergraduate and graduate calendar was produced.
Custodial History
The Brandon College/University calendar was produced by the Registrar's Office. Individual copies of the calendar were held by the Registrar's Office until their transfer to the University Archives.
Scope and Content
The sub-series consists of general calendars, general undergraduate and graduate calendars, as well as calendars for the School of Music, the Faculty of Education, and for spring and summer sessions. It has been divided into three sub sub series, including: (1) Calendars - bound archival copies; (2) Calendars - researcher's copies; and (3) Calendars - miscellaneous.
Notes
The Registrar, acting in his/her capacity as Secretary of Senate, is responsible for the production of the University calendar.
Bridge built by the Canadian Pacific Railway and presented to City of Brandon in 1904 in exchange for permission to close the level crossing at Sixth Street; Iron cantilever bridge over tracks; Two timber trestles each two blocks long running east and west connected to Assiniboine Avenue; Pedestrian stairway connected to Eight Street North
West approach torn down August 1934 and timber used to resurface East approach
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of original Eighth St. bridge from Christie Building, including East and West ramp approaches from Assiniboine Ave.
Notes
Photographer I.C. Barton from Chicago Illinois.
Additional historical information provided by Fred McGuinness collection (20-2009).
Contract for concrete approach from north end to replace east and west timber approaches along Assiniboine Ave. awarded to A.E. Jones and E. Fulcher for $30,590. Oct. 11, 1934. (Brandon Sun). As part of this project a Z-shaped ramp on the west side to Assiniboine Ave for pedestrians replaced wooden stairs to north end.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of East side of original Eighth St. bridge from Pacific Avenue; Shows pedestrian stairway to North end and CPR early 2800 [locomotive] being serviced on Train No.4