For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of Prince Edward Hotel under construction.
Notes
For details regarding construction negotiations between the City of Brandon and Canadian Northern Railway, see Brandon: A City, by G.F. Barker, page 126.
Excavated earth was loaded into a hopper, which itself was on a rail running a half block back. It was then dumped back to fill the trench where pipe installation had already been completed - Art Baker (of Art's Confectionery, NE 15th St. & Princess Ave.). This information was provided in response to a request in the Brandon Sun (Fred McGuinness) for further information.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Brandon sewer line construction
Notes
View of Pacific Avenue, looking east from 5th Street
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Brandon Hills Church Choir
Notes
Left to right. Back row: Mrs. Alden Blight, Wes. Stewart, Bessie Waugh (nee Roddick, later Chapman), Mary Baker, Alden Blight. Front row: Rachael Baker, Aletha Blight, Mr. Waugh.