Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant.
Notes
Writing on the back of the photograph reads: "10 mile dam". Biographical information obtained from Manitoba Historical Society.
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant. The dam's timber construction is quite evident in the picture.
Notes
Writing on the back of the photograph reads: McGuinness (Manitoba Hydro), on Little Saskatchewan.
Brandon's first church; Showing renovations of 1895; A new building started construction in 1898, its cornerstone laid in 1899 by Mrs. Clifford Sifton.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
First Methodist Church, 1881-1899
Notes
Located on 7th St. between Lorne & Louise Ave's.
People in photo, L to R: Mrs. Adams, Mrs. Leegh, Mrs. Van Tassel, Mrs. Ashley, B. Trotter, Mrs. Trotter, Rev. Leonard Gaetz, Mrs. Bodden, Rev. Darrel, J. Sproul, E. Bennest, D. Reesor, Mr. Bodden, T. Butcher; From collection of Central United Church.