According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 538
Notes
Great Northern Railway engine 538 was a class F-1 2-8-0 ["Consolidation" type], and often worked freight trains to Brandon.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 716
Notes
Great Northern Railway 4-8-0 class G-3 locomotives were known to have worked freight trains to Brandon.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway freight shed, Brandon, Manitoba.
Notes
Office end (foreground) razed 1984; remainder demolished January 8, 1986.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station in Brandon, Manitoba.
Notes
[Looking southeast; Pacific Avenue was located directly north (left) of the station and tracks. P.E. 30/07/09]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station at Boissevain, Manitoba.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern wedge snowplow on ore gondola, Minot, ND.
Notes
From the collection of George H. Harris, Winnipeg, Manitoba.
Stuckey and Bain (1996, p. 21) note that "Built in the company shops, simply by adding a plow to an ore jenny which was filled with rocks, these vehicles were quite effective at removing snow from single tracks."
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Canadian Pacific (left) and Great Northern (right) railway stations and yards in Brandon, Manitoba.
Notes
[This negative appears to have been produced using a previously published image. P.E. 30/07/09]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
This engine was built by Brooks in March of 1883 as No. 887 and marked as scrap [by the GN] in 1937. This engine is known to have worked passenger trains to Brandon. This class of locomotive was replaced by gas-electric [power units] in 1929 but they would be used if no gas-electric was available. Engine 185 sat dead in Minot from the closing of the Brandon line until it was scrapped.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Engine 185, a class B-19 4-4-0 ["American"] type at Minot, ND.
Notes
Small copy neg. Quote in HistoryBio taken from Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
According to Stuckey and Bain (1996), the Great Northern opened its line from the US border to Gretna and Portage La Prairie, Manitoba on March 11, 1907. It was subsequently purchased in 1909 by the Manitoba Great Northern Railway Company – a wholly owned subsidiary of the Great Northern Railway. In 1926 the 76.14 miles of track from Portage La Prairie to Gretna was abandoned, with the exception of a 25 mile section from Carman to Plum Coulee, which was sold to the Canadian Pacific Railway. (p. 16)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 224 & passenger train, Gretna, Manitoba.
Notes
Great Northern Railway engine 224 was a class B-21 4-4-0 ["American" type], built by Rogers in 1887. It had 18 x 24 inch cylinders and 63 inch drivers.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 208 & passenger train, Hayfield, Manitoba.
Notes
[Great Northern Railway engine 208 was a class B-21 4-4-0 ["American" type], built by Rogers in 1887. It had 18x24" cylinders and 63" drivers.]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 208 & passenger train, Brandon, Manitoba.
Notes
Great Northern Railway engine 208 was a class B-21 4-4-0 ["American" type], built by Rogers in 1887. It had 18x24" cylinders and 63" drivers.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 208 & passenger train, Brandon, Manitoba.
Notes
[Great Northern Railway engine 208 was a class B-21 4-4-0 ["American" type], built by Rogers in 1887. It had 18x24" cylinders and 63" drivers.]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern [gas-electric power unit] 2327 & Train at Rugby, ND.
Notes
Built by Brill/Westinghouse in June of 1928; scrapped June 1956. This unit ran with a similar train to Brandon, Manitoba from 1929 until 1936.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of Canadian Pacific (foreground) and Great Northern (background) railway yards, as well as Great Northern station in Brandon, Manitoba.
Notes
Shows a 500 series F-1 class 2-8-0 engine switching
Published in Canadian Rail, August 1975
Buildings that are visible in this photo, but now gone (1987), include Codvilles, Western Grocers (Burbridge Saddlery), John E. Smith Block, Federal building, City Hall, and the Prince Edward Hotel [Fred McGuinness collection (20-2009)].
[This copy negative was produced using a previously published image. P.E. 30/07/09]
Reg Forbes was born September 16, 1924. He and his wife Clara have two children, Bob and Faye. Forbes served in the Royal Canadian Air Force as a Navigator during World War II. From 1945-1949, he attended the University of Manitoba where he received his B.Sc.A. While working as Village Councillor and as Secretary-Treasurer for the Pilot Mound Hospital, Forbes initiated the "Save the Soil Campaign," a soil conservation programme that became province-wide, between 1952-1962.
From 1956-1975, Forbes was the Principal of the Agricultrual Extension Centre in Brandon, where he reorganized the Adult Education Centre into the Agricultural Extension Centre. During this period, Forbes was a founding member of the West-Man Regional Development Corporation and a founder of the Manitoba Committee on Rural Leadership. He was also instrumental in the amalgamation of the Royal Manitoba Winter Fair and the Provincial Exhibition and in the resulting construction of the Keystone Centre.
From 1975-1977 Forbes was a Commissioner for the Grain Handling and Transportation Commission (Hall Commission/GHTC). Following his work with the Commission, Forbes was employed as the General Manager of the Provincial Exhibition of Manitoba (1977-1979), the Director of the Grain Handling & Transportation Section of the Manitoba Department of Agriculture (1979-1983), the Industrial Commissioner for the Brandon Industrial Commission (1983-1986), and as the Westarc Group Inc. Project Director for delivery under contract of Canadian Rural Transition Programme in Manitoba.
Forbes also held a number of voluntary and elected positions, such as Long-term Director and President of the Royal Manitoba Winter Fair and of the Provincial Exhibition of Manitoba. In 1970-1971, he was the President of the Agricultural Institute of Canada, and from 1978-1981, Forbes was the first chairman of the Agricultural Advisory Committee of the Canadian Broadcasting Corportation. He was also a member of the Canada West Foundation Board, the Brandon University Board of Governers (1974-1976), and the Federal-Provincial Transportation and Industrial Development Advisory Committee (TIDAC). Forbes is also a Fellow of the Agricultural Institute of Canada. In 1977, he received the Jubilee Medal and in 1987, he was given the Distinguished Agrologist Award by the Manitoba Institute of Agrologists.
Custodial History
Reg Forbes donated his working collection of briefs, correspondence and other documents relating to his work as a commissioner of the Grain Handling and Transportation Committee (GHTC) to the McKee Archives c. 1985.
Scope and Content
The majority of the collection consists of records created and received by the Royal Commission on Grain Handling and Transportation (GHTC). Included are documents detailing numerious hearings from all four Western provinces. In addition to the GHTC hearings, there are also a number of documents given to the GHTC as reference material. These include information on the Snavely Commision, documents for the province of Alberta, various reports, the Prairie Regional Studies in Economic Geography (No. 1-27) and General Information. The collection also includes two maps given to the GHTC.
First course began 1913, last class graduated 1941
B.J. Hales (of Winnipeg) first principal, 1st term - 184 students
1941-1945 used by military as part of army A-4 training center - the normal teacher training courses were then held in Daymin Court (12th St & Rosser), Bell Block, and the old Central School
Transfered to Manitoba Department of Agriculture 1946, Became Agricultural Extension Centre 1959
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.