The Medicine Hat Exhibition and Stampede Parade Day was held on Thursday, July 19, 1962, at 9:30 a.m. The local newspaper reported that approximately 24,000 people were in attendance to see parade marshall Rod Ashburner leading 175 entries consisting of 90 floats, 75 horses, and 10 bands. There were 19 parade categories eligible for $12,000 in prize money and included: junior and senior cowboys and cowgirls; fancy and Shetland ponies; sulky class open; comic, commercial, industrial and organizational floats; decorated cars; special ranch class; 4-H Clubs; and a non-competitive class.
The parade route started at Second St. and Allowance Ave., from Second St. to Ash Ave., north on Ash to First St. SE., from First St. S.E. to Fourth Ave., south to Second St. to South Railway St., south on South Railway St. to Third St., with a finish at McLeod Trail. A route map was published in the Medicine Hat News the day before the parade.
Aerial photographs of the parade were taken by Medicine Hat News photographer Howard Heid (1930-2005) from the private helicopter of John Bourn. Bourn was a pilot from Woodville, Wisconsin, who chartered his four-seater helicopter for sight-seers at exhibitions and stampedes across the county.
(Sources: Pat Currie, "Let 'Er Go!," Medicine Hat News, 19 July 1962,1; Harald Gunderson, "'Eye in the Sky' Best Parade View," Medicine Hat News, 19 July 1962,1; "Parade Starts at 9:30 Sharp," 18 July 1962)
Scope and Content
Photograph shows an aerial view of the Medicine Hat Exhibition and Stampede Parade route, with a focus on Second Street SE. Visible store signs include: Gardener's Used Cars, Provincial Treasury Branch, Furvey's Furniture and Appliances, J.J. Moore & Son Furniture, Alberta Credit Jewellers, James Richardson & Sons, Medicine Hat Gas Power Water City Owned Utilities.
Notes
This photograph shows the neighbourhood before rezoning and commercial development.
The Original Brandon Fire Hall was located on the east half of the north side of the 600-block of Princess Avenue. The hall was in operation from 1884 to 1911.
Scope and Content
Photograph shows Brandon's first fire hall on Princess Avenue. The hose tower and stable are visible. The horse-drawn ladder wagon is parked on the street in front of the hall and the rescue ladder is extended against the tower. Five firefighters are standing on the ladder and two are standing at its base.
Notes
Writing on the back of the photograph reads: Mrs. E. Harden, 6th Street
The Original Brandon Fire Hall was located on the east half of the north side of the 600-block of Princess Avenue. The hall was in operation from 1884 to 1911.
Scope and Content
Photograph shows Brandon's first fire hall on Princess Avenue facing east. The hose tower and stables are visible. The three horse-drawn ladder wagon is parked is on the right. Pairs of horses are harnessed to two hose wagons. A dog sits on the street before the parked wagons.
Notes
Writing on the back of the photograph reads: 1903 or 1905, "First Fire Hall," Princess Avenue, Brandon, Man.
Brient was a point along the Algoma Central Railway line that connected the Helen Mine to the Michipicoten Harbour. It is located southwest of Wawa, Ontario.
Scope and Content
Photograph shows ore box cars in a railway yard.
Notes
Writing beneath the photograph in the album reads: yard at Brient
Photograph shows a group of eleven young men posing in the brush at Y Point, Pelican Lake.
Notes
Writing on the back of the photograph reads: Leader training camp Y Point, Pelican Lake, 1925. Ozzie Doak, holding rod. G. Baldock with striped hat kneeling.
Note affixed to back of photograph reads: 1925 Leadership Training Camp - "Y" Point, Pelican Lake. Stand Left to Rigt. 1st unknown, Rainy River; Archie MacDonald, Carroll; Gordon MacDonald, Stonewall; Edward Armstrong, Wpg; Osborne Doak, Brandon; Roy Grassick, Carroll; Hayden Stewart, Wpg. Front Row. Left. Louis Schroeder, Wpg; Orville McKillop, Portage la Prairie; Sherman Black, Wpg; George Baldock (striped hat), Brandon.
Photograph shows the hanger of the Commonwealth Air Training Plan Museum where aircraft are on display. Bolingbroke and Stinson aircrafts are on display.
Photograph shows the hanger at the Commonwealth Air Training Plan Museum containing the displays of WWII-era planes. A Lysander aircraft is on display.
Photograph shows the hanger at the Commonwealth Air Training Plan Museum containing the displays of WWII-era planes. A Tiger Moth aircraft is on display.
Suffield, Alberta, is situated approximately 40km northwest of Medicine Hat, Alberta. A few "large explosive events" (100 to 500 tons) were conducted at the Defence Research Board's (DRB) Suffield Experimental Station in the 1960s. On 19 January 1961, Medicine Hat citizens felt tremors in the community as a result of five tons of TNT being detonated at the station. The station director attributed this anomaly to freak atmospheric and weather conditions. At the time the DRB was testing the effects of shock waves on military equipment.
In July 1964, the Suffield Experimental Station detonated 30,600 blocks of TNT - 500 tons - to test the largest, non-nuclear, non-confined, surface blast. Placed in various sections radiating from ground zero to test the effects of the blast were targets, dummy-men, miscellaneous instruments, mines, model ships, nose cones, repirators, vehicles, subterranean chambers, shelters, tunnels, foxholes, and trenches. Several hundred people were expected to observe the blast, including 80 "official observers" and a VIP party of military and research personnel from Canada, the United States, and Britain.
(Sources: "Hellyer Heads VIP List Coming Here for SES Blast," Medicine Hat News, 09 July 1964, 7; Patrick J.Roe, "Blast Area Awaits a Cloudless Day," Medicine Hat News, 16 July 1964, 2; "Suffield Explosion Felt Here," Medicine Hat News, 19 January 1961, 7)
Scope and Content
Photograph shows observors waiting for a detonation at the Suffield Experimental Station. Camera operators can be seen on the right waiting to film the blast.
Suffield, Alberta, is situated approximately 40km northwest of Medicine Hat, Alberta. A few "large explosive events" (100 to 500 tons) were conducted at the Defence Research Board's (DRB) Suffield Experimental Station in the 1960s. On 19 January 1961, Medicine Hat citizens felt tremors in the community as a result of five tons of TNT being detonated at the station. The station director attributed this anomaly to freak atmospheric and weather conditions. At the time the DRB was testing the effects of shock waves on military equipment.
In July 1964, the Suffield Experimental Station detonated 30,600 blocks of TNT - 500 tons - to test the largest, non-nuclear, non-confined, surface blast. Placed in various sections radiating from ground zero to test the effects of the blast were targets, dummy-men, miscellaneous instruments, mines, model ships, nose cones, repirators, vehicles, subterranean chambers, shelters, tunnels, foxholes, and trenches. Several hundred people were expected to observe the blast, including 80 "official observers" and a VIP party of military and research personnel from Canada, the United States, and Britain.
(Sources: "Hellyer Heads VIP List Coming Here for SES Blast," Medicine Hat News, 09 July 1964, 7; Patrick J.Roe, "Blast Area Awaits a Cloudless Day," Medicine Hat News, 16 July 1964, 2; "Suffield Explosion Felt Here," Medicine Hat News, 19 January 1961, 7)
Scope and Content
Photograph shows a detonation at the Suffield Experimental Station.
Suffield, Alberta, is situated approximately 40km northwest of Medicine Hat, Alberta. A few "large explosive events" (100 to 500 tons) were conducted at the Defence Research Board's (DRB) Suffield Experimental Station in the 1960s. On 19 January 1961, Medicine Hat citizens felt tremors in the community as a result of five tons of TNT being detonated at the station. The station director attributed this anomaly to freak atmospheric and weather conditions. At the time the DRB was testing the effects of shock waves on military equipment.
In July 1964, the Suffield Experimental Station detonated 30,600 blocks of TNT - 500 tons - to test the largest, non-nuclear, non-confined, surface blast. Placed in various sections radiating from ground zero to test the effects of the blast were targets, dummy-men, miscellaneous instruments, mines, model ships, nose cones, repirators, vehicles, subterranean chambers, shelters, tunnels, foxholes, and trenches. Several hundred people were expected to observe the blast, including 80 "official observers" and a VIP party of military and research personnel from Canada, the United States, and Britain.
(Sources: "Hellyer Heads VIP List Coming Here for SES Blast," Medicine Hat News, 09 July 1964, 7; Patrick J.Roe, "Blast Area Awaits a Cloudless Day," Medicine Hat News, 16 July 1964, 2; "Suffield Explosion Felt Here," Medicine Hat News, 19 January 1961, 7)
Scope and Content
Photograph shows blast targets/dummies pre-detonation at the Suffield Experimental Station.
Suffield, Alberta, is situated approximately 40km northwest of Medicine Hat, Alberta. A few "large explosive events" (100 to 500 tons) were conducted at the Defence Research Board's (DRB) Suffield Experimental Station in the 1960s. On 19 January 1961, Medicine Hat citizens felt tremors in the community as a result of five tons of TNT being detonated at the station. The station director attributed this anomaly to freak atmospheric and weather conditions. At the time the DRB was testing the effects of shock waves on military equipment.
In July 1964, the Suffield Experimental Station detonated 30,600 blocks of TNT - 500 tons - to test the largest, non-nuclear, non-confined, surface blast. Placed in various sections radiating from ground zero to test the effects of the blast were targets, dummy-men, miscellaneous instruments, mines, model ships, nose cones, repirators, vehicles, subterranean chambers, shelters, tunnels, foxholes, and trenches. Several hundred people were expected to observe the blast, including 80 "official observers" and a VIP party of military and research personnel from Canada, the United States, and Britain.
(Sources: "Hellyer Heads VIP List Coming Here for SES Blast," Medicine Hat News, 09 July 1964, 7; Patrick J.Roe, "Blast Area Awaits a Cloudless Day," Medicine Hat News, 16 July 1964, 2; "Suffield Explosion Felt Here," Medicine Hat News, 19 January 1961, 7)
Scope and Content
Photograph shows blast targets/dummies post-detonation at the Suffield Experimental Station.
Emulsion is cracking and photograph is starting to warp
History / Biographical
Suffield, Alberta, is situated approximately 40km northwest of Medicine Hat, Alberta. A few "large explosive events" (100 to 500 tons) were conducted at the Defence Research Board's (DRB) Suffield Experimental Station in the 1960s. On 19 January 1961, Medicine Hat citizens felt tremors in the community as a result of five tons of TNT being detonated at the station. The station director attributed this anomaly to freak atmospheric and weather conditions. At the time the DRB was testing the effects of shock waves on military equipment.
In July 1964, the Suffield Experimental Station detonated 30,600 blocks of TNT - 500 tons - to test the largest, non-nuclear, non-confined, surface blast. Placed in various sections radiating from ground zero to test the effects of the blast were targets, dummy-men, miscellaneous instruments, mines, model ships, nose cones, repirators, vehicles, subterranean chambers, shelters, tunnels, foxholes, and trenches. Several hundred people were expected to observe the blast, including 80 "official observers" and a VIP party of military and research personnel from Canada, the United States, and Britain.
(Sources: "Hellyer Heads VIP List Coming Here for SES Blast," Medicine Hat News, 09 July 1964, 7; Patrick J.Roe, "Blast Area Awaits a Cloudless Day," Medicine Hat News, 16 July 1964, 2; "Suffield Explosion Felt Here," Medicine Hat News, 19 January 1961, 7)
Scope and Content
Photograph shows a detonation at the Suffield Experimental Station.
Cando Contracting Ltd. was found in 1978 by Gord Peters and Rick Hammond. The company began as a small rail line dismantling and salvage company operating out of Brandon, Manitoba. The company changed its name in 2013 to Cando Rail Services Ltd., which supplies railway support services (e.g., engineering and track services, industrial rail services, mechanical services, rail car storage, railway material sales, short line operations, transload services) to industry and the rail sector. The company maintains its headquarters in Brandon, Manitoba, and has regional offices located in Calgary, Edmonton, Winnipeg, Whitby, and Adel (Iowa). (Source: www.candoltd.com, accessed 05 Dec 2015)
Scope and Content
Photograph shows Gord Peters standing in front of the rail car that forms the entrance of Cando Contracting Ltd. in Brandon, Manitoba
Photograph shows the buildings of the Brandon General Hospital
Notes
Part of "Christie's Brandon Series of Six Colored Picture Postcards of Brandon, Manitoba, The Crown Series, Published by Christie's Bookstore, Brandon, Man." [note: missing sixth postcard]. Writing on the front of the photograph reads: Brandon General Hospital, Brandon, Man.