Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern [gas-electric power unit] 2327 & Train at Rugby, ND.
Notes
Built by Brill/Westinghouse in June of 1928; scrapped June 1956. This unit ran with a similar train to Brandon, Manitoba from 1929 until 1936.
As of this date, most homes in the city have been heated with natural gas for 20 years. However there is still a good market for stoker coal in rural areas, and Cumming & Dobbie seem to be the last agents for it.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Cumming & Dobbie Coal Dock
Notes
Located on the 600 block of 9th Street
This view [from the south] includes 3 Canadian National coal hoppers
[Mr. Stuckey put 2 negatives in same envelope. We separated them and numbered them EA30(1) and EA30(2).]
As of this date, most homes in the city have been heated with natural gas for 20+ years. However there is still a good market for stoker coal in rural areas, and Cumming & Dobbie seem to be the last agents for it.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Cumming & Dobbie Coal Dock
Notes
Located on the 600 block of 9th Street
This view, from the northwest, includes a Norfolk & Western hopper car of smith (forge) coal from Pennsylvania.
[Mr. Stuckey put 2 negatives in same envelope. We separated them and numbered them EA30(1) and EA30(2).]
This coal dock was purchased from W.E. Strange & Son in 1958. It was moved from the east side of the 300 block of 10th Street to this location on the west side of the 600 block of 8th Street.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Photograph is looking northeast and shows the Western Canada Flour Mill Co. Ltd. complex (purity flour, oat meal, feed) and a couple of horse drawn carts.
Notes
Corresponds with negative 1-2002.3.9.H4.
Repro Restriction
The McKee Archives is the copyright holder for the Stuckey materials.
George White's No. 2 plant was located in Brandon, north of the CPR tracks about 15th Street. These steam engines were assembled here, but the actual extent of manufacture is not known. LAS.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
George White steam traction engine
Notes
Photo taken in Killarney, Manitoba
Sign on smoke box door (front end) reads: George White & Sons; London and Brandon; First Quality Line