Built in 1991-1992 for $1.4 million, the official opening of the Centre was May 29, 1992. The centre is currently (April 2010) called the Addictions Foundation of Manitoba, Parkwood Centre.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Alcoholism Foundation of Manitoba (AFM), Parkwood Treatment Centre located on Victoria Avenue East.
Built in 1991-1992 for $1.4 million, the official opening of the Centre was May 29, 1992. The centre is currently (April 2010) called the Addictions Foundation of Manitoba, Parkwood Centre.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Alcoholism Foundation of Manitoba (AFM), Parkwood Treatment Centre.
Built in 1956 on the southeast east corner of 10th St. and Rosser Avenue (former site of the Olympia Cafe)
In the summer of 1981 the S.S. Kresge store closed, and the Bass Building was purchased by the Bank of Montreal with the intention to renovate and open in 1982.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Bass Building (ex. S.S. Kresge store)
Notes
[Mr. Stuckey indicated on the envelope that there are two negatives, but only one in enclosed.]