The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put 5 and 5 prints negatives in the same envelope. We have separated them and numbered the negatives CA15(1) to CA15(5), and the corresponding prints CA15(1a) to CA15(5a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
The Brandon Asylum for the Insane
Notes
The entire Brandon Asylum complex was completely destroyed. Patients were temporarily housed in the Winter Fair Building (located on the 500 block of 10th Street).
It is reported that the nearly 700 staff and patients were evacuated without any loss of life due to the fire itself (Refvik K. 1991. The Brandon Asylum Fire of 1910. Manitoba History, Number 21, Spring 1991).
The first building was built in 1890 as a reformatory (on right).
A four-story structure (centre) was built in 1892 and the former reformatory became an administrative section. Together they became the Brandon Asylum for the Insane.
[A third building (on left) began construction in 1903. (P.E.)]
This complete set of buildings was destroyed by fire on November 4, 1910 (see file FA2).
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
The first building was built in 1890 as a reformatory (on right).
A four-story structure (centre) was built in 1892 and the former reformatory became an administrative section. Together they became the Brandon Asylum for the Insane.
[A third building (on left) began construction in 1903. (P.E.)]
This complete set of buildings was destroyed by fire on November 4, 1910 (see file FA2).
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
To the left of the photographer (in trees) was a building used to shelter and feed birds; Some ducks and geese used this facility to stay in Brandon during the winter months; From the duckpond south to Richmond Avenue was a buffalo paddock; Normally at least six each of buffalo and elk breeding stock were kept here, and we would flock to see the newborns of each.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Duckpond on Brandon Fairgrounds, looking west
Notes
The Keystone Centre in now on this site
[Mr. Stuckey included two images on the same negative. We have separated them, numbering them M23(1) and M23(2).]
To the left of the photographer (in trees) was a building used to shelter and feed birds; Some ducks and geese used this facility to stay in Brandon during the winter months; From the duckpond south to Richmond Avenue was a buffalo paddock; Normally at least six each of buffalo and elk breeding stock were kept here, and we would flock to see the newborns of each.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Duckpond on Brandon Fairgrounds, looking west
Notes
The Keystone Centre in now on this site
[Mr. Stuckey included two images on the same negative. We have separated them, numbering them M23(1) and M23(2).]
To the left of the photographer (in trees) was a building used to shelter and feed birds; Some ducks and geese used this facility to stay in Brandon during the winter months; From the duckpond south to Richmond Avenue was a buffalo paddock; Normally at least six each of buffalo and elk breeding stock were kept here, and we would flock to see the newborns of each.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Farm wagons at Great Northern (BS&HB) station in Bunclody, Manitoba.
Notes
From the collection of Gilford Copeland of Bunclody, Manitoba
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern wedge snowplow on ore gondola, Minot, ND.
Notes
From the collection of George H. Harris, Winnipeg, Manitoba.
Stuckey and Bain (1996, p. 21) note that "Built in the company shops, simply by adding a plow to an ore jenny which was filled with rocks, these vehicles were quite effective at removing snow from single tracks."
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station at Boissevain, Manitoba.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway Weed Burner, Rugby, ND.
Notes
The Great Northern used the same unit on its line to Brandon.
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Katherine Stinson & aircraft with Indigenous peoples
Notes
Photo taken in Brandon, Manitoba
Miss Stinson was half Indigenous
See Lawrence Stuckey file (Finding Aids) for biography of Katherine Stinson.
[Please note that in the title we have chosen to maintain the original terminology used by Mr. Stuckey in order to maintain the original context and order of the record. P.E. 08/07/09.]
Former home of J.E. Smith, early farmer, horse breeder and businessman - died 1919. Became city property. To Allied Arts Council 1950's. Arts Centre moved to former Co-op Store, 600 block of Princess Ave. 1984.
[In 2000, the renamed Art Gallery of Southwestern Manitoba moved to the former Eaton’s building attached to The Town Centre (former Gallery Mall). P.E. 05/06/09]
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.