A series of thirteen blueprints was prepared for the proposed new lecture building and theatre. Blueprints four and eleven are missing from this collection. Those included provide a plot plan for the buildings within the general campus and individual schedules showing various features of the new buildings.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
This consists of a series of five blueprints for the proposed new science building: third floor organic chemistry; second floor biology lab; two blueprints of first floor, advanced optics, general physical laboratory; basement.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
This consists of a series of four blueprints for the proposed new science building: third floor organic chemistry; second floor biology lab; first floor, advanced optics, general physical laboratory; basement.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
View is north northeast. Photograph shows the Brandon College Building in the foreground with the Education Building and North Hill in the background. Photo was taken from the roof of McMaster Hall.
Photograph is looking northwest probably from the John R. Brodie Science Centre and shows the Citzens' Science Building, the Brandon College Building, Clark Hall and a portion of the driveway and grounds in front of the buildings.
Item is a pen and ink drawing of the Brandon College Building and Clark Hall by Brandon artist Doug Brolund to be used by the University in its "Building for Strength" campaign. A card attached to the print said: "Building from Strength compliments of John R. Mallea and L.D. Whitehead."
Storage Location
RG 6 Brandon University fonds
Series16: Brandon University/College artifacts
16.3 Artifacts - other
A series of five blueprints containing plans for the library addition c. 1991. Blueprints include main floor of addition including existing foyer, second floor including existing arts building and the mezzanine floor of the existing library and arts building.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
A series of sixteen blueprints A 4 - A19 ( A -1, A -2, A -3 missing) containing detailed plans for the construction of the library addition. Blueprints include main floor of addition including existing foyer, second floor including existing arts building, and the mezzanine floor of the existing library and arts building.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
A series of eight blueprints containing plans for the construction of the library addition. Blueprints include site plan including entire campus circa 1991, main floor of addition including existing foyer, second floor including existing arts building, the mezzanine floor of the existing library and arts building, and external view north west elevation.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
A series of four blueprints containing detailed plans for the handrail fixtures for the stairwell connecting the main and second floors of the library addition.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
One blueprint containing detailed drawings of the basement floor of the proposed library addition. This area was referred to as the heritage floor as it was initially devoted to museum and archaeological classroom and laboratory spec.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
One blueprint containing detailed drawings of the "revised circulation/servicing concept" concerning the movement of people and the servicing of the proposed library addition.