Photograph was taken from the basement looking up and shows support beams, an outer wall covered in vapor barrier plastic, some windows and the missing roof. The windows may be part of one of the stairwells.
Photograph shows construction on the basement of the Brandon College Building and Clark Hall, including support beams, concrete walls, mounds of dirt and a number of workers.
Photograph shows what appears to be a flood in one of the hallways of the Brandon College Building and Clark Hall after the interior walls had been framed out.
Photograph is looking southeast from 20th Street and shows the laying of pipes to the north of Darrach Hall and the Dining Hall as part of the Library extension. Photograph also shows a man surveying the site.
Photograph was taken from inside the building looking out onto the courtyard. It shows scaffolding around the hole in the wall that would become the rear entrance to the Brandon College Building and Clark Hall.
Photograph is looking either north or south into the A.E. McKenzie Building (Library and Arts Building) during construction. A number of the members of the construction crew are visible.
Photograph is looking east northeast and shows the construction of the A.E. McKenzie Building (Library and Arts Building). Clark Hall is in the background.