Photograph shows renovations to the third floor of the Brandon College Building and Clark Hall, including the new floor joists and the missing section of the wall.
One blueprint containing detailed drawings of the basement floor of the proposed library addition. This area was referred to as the heritage floor as it was initially devoted to museum and archaeological classroom and laboratory spec.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
Furnishings, layouts and exhibits as at the time of opening. Allan Budlong (student), Barbara Ritchie (staff) Library Foyer, 2nd floor Library and Arts Building
A series of three blueprints containing detailed drawings of floor plans for the library addition c. 1991 including the existing library. The drawings relate in particular to the location of books stacks, periodical and reference publication storage.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents