According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Remnants of Great Northern Railway, Hebron, Manitoba. Visible features include the former Great Northern (BS&HB) Railway grade with tie indents, as well as concrete foundation blocks that may have been used for a coal dock.
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put two negatives and two prints in the same envelope. We have separated them, numbering the negatives PE28(1) and PE28(2), and the respective prints PE28(1a) and PE28(2a).
Photograph shows a reception of the King and Queen of Siam at the Winnipeg Railway Station by Manitoba dignitaries. L to R: Major M.Turner, Hon. J.D. McGregor, Premier John Bracken (1922-1943), Their Majesties the King and Queen of Siam, Miss Phyllis Webb, and Mayor Ralph Webb (1925-1927, 1930-1934).
Notes
This photograph was originally part of the J.D. McGregor fonds.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of Canadian Pacific (foreground) and Great Northern (background) railway yards, as well as Great Northern station in Brandon, Manitoba.
Notes
Shows a 500 series F-1 class 2-8-0 engine switching
Published in Canadian Rail, August 1975
Buildings that are visible in this photo, but now gone (1987), include Codvilles, Western Grocers (Burbridge Saddlery), John E. Smith Block, Federal building, City Hall, and the Prince Edward Hotel [Fred McGuinness collection (20-2009)].
[This copy negative was produced using a previously published image. P.E. 30/07/09]
The idea of the Keystone Centre was first mentioned in 1958, at a meeting of the board of directors of the Manitoba Winter Fair. The Manitoba Winter Fair wanted a new facility because the old Wheat City Arena had a leaking roof and a deteriorating west wall. The old facility also had limited space and the Winter Fair felt it needed more space for expansion. The Provincial Exhibition of Manitoba also had problems with their facilities, such as old barns and poor display areas. The idea of the Keystone Centre was put on hold until 1969, when the boards of the Provincial Exhibition and the Manitoba Winter Fair joined together as the Provincial Exhibition Association of Manitoba and the Wheat City Arena was sold and demolished. The original estimate for the cost of the Keystone Centre facilities was $4.5 million and funding would be proportioned so that the federal and provincial governments would each put in one-third of the money, with the rest coming from local donations. The financial campaign for the Keystone Centre began in 1970, and construction began in November 1970. The grand opening of the Centre was in March 1973, and coincided with the Royal Manitoba Winter Fair of that year.
Custodial History
This fonds was accessioned by the McKee Archives in 1998. Prior custodial history is unknown.
Scope and Content
Fonds contains many folders full of correspondence, financial statements, meeting minutes and other documents relating to the development and construction of the Keystone Centre from 1970-1974, including those from the Keystone Executive Committee, as well as the Building Committee. Fonds also contains one folder that pertains to the Brandon Area Agricultural Development Survey from 1959. This folder contains the names and locations of all farmers in the Brandon area in 1959. The Brandon Area Agricultural Development Survey was created in 1959, in order to make farming in the Brandon area more profitable. The survey was aided by Doane Agricultural Service from St. Louis, Missouri, who had success creating agricultural development programs in the United States. Fonds also contains folders from the Provincial Exhibition with correspondence, pamphlets, estimates, and studies from the 1960's. There is also one folder belonging to the Manitoba Winter Fair, which contains correspondence and financial statements relating to the Wheat City Arena. Fonds also contains information pertaining to the proposals made in the 1960's, for the building of the Keystone Centre, as well as one folder about the Keystone campaign from 1970-73. There is also one folder about the opening of the Keystone Centre, which contains newspaper clippings and guest lists. Finally, the fonds contains information about a court case involving Albert Bobyk and Robert Stewart. Stewart was the project manager for the Building Committee and Bobyk worked on the Keystone Center. The fonds includes a report about the trial of the two men who were charged with fraud involving their work on the Keystone Centre.
During the mid-1930s the economy and popularity of light, fast passenger trains were proven in the USA by the Burlington’s "Zephyr", the Rock Island’s "Rocket", and the Milwaukee Road’s "Hiawatha". In 1936 the CPR built engines 3000-3004, designing each to haul a lightweight baggage car and three day coaches. Before being assigned to "The Chinook" between Calgary and Edmonton, engine 3001 and its train made an extensive publicity tour of western Canada.
[Built by Montreal Locomotive Works in 1936, this class of five F2a 4-4-4 locomotives (3000 - 3004) were named "Jubilee" type in honour of the 50th anniversary of CPR transcontinental service. P.E.]
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
CPR streamlined engine No. 3001 & train
Notes
Canadian Pacific Railway's first streamlined engine [class] on display in Brandon
Copy negative LAS with permission
[Mr. Stuckey numbered two envelopes P24. We have kept the same number but designated the first envelope P24(1) and the second envelope P24(2).]
During the mid-1930s the economy and popularity of light, fast passenger trains were proven in the USA by the Burlington’s "Zephyr", the Rock Island’s "Rocket", and the Milwaukee Road’s "Hiawatha". In 1936 the CPR built engines 3000-3004, designing each to haul a lightweight baggage car and three day coaches. Before being assigned to "The Chinook" between Calgary and Edmonton, engine 3001 and its train made an extensive publicity tour of western Canada.
[Built by Montreal Locomotive Works in 1936, this class of five F2a 4-4-4 locomotives (3000 - 3004) were named "Jubilee" type in honour of the 50th anniversary of CPR transcontinental service. P.E.]
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
CPR streamlined engine No. 3001 & train
Notes
Canadian Pacific Railway's first streamlined engine [class] on display in Brandon.
CPR 2816 is a class H1b Hudson-type locomotive built by Montreal Locomotive Works in December 1930. Having logged more than two million miles in active service, 2816 made its final revenue run on May 26, 1960. After a complete three-year rebuild, 2816 was restored to its original specifications with external details from the 1930/40s, and re-entered active service in 2001 as a roving ambassador for Canadian Pacific Railway. [Information from Canadian Pacific Railway's website - www.cpr.ca. P.E. 28/07/09]
First engine on CPR's western lines with smoke deflectors - aka "elephant ears".
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
CPR Engine 2816 being serviced on [passenger train] No. 3
Notes
Note image of L.A. Stuckey as 15-year-old boy in foreground
Copy negative
From the collection of the [UK] National Railway Museum, Leeman Road, York, England.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern (BS&HB) Railway train in deep snow.
Notes
From the collection of Gilford Copeland of Bunclody, Manitoba
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 538
Notes
Great Northern Railway engine 538 was a class F-1 2-8-0 ["Consolidation" type], and often worked freight trains to Brandon.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 716
Notes
Great Northern Railway 4-8-0 class G-3 locomotives were known to have worked freight trains to Brandon.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway freight shed, Brandon, Manitoba.
Notes
Office end (foreground) razed 1984; remainder demolished January 8, 1986.