Stuckey's notes: Spur from M and B Junction to Wawanesa was designated as closed Dec. 31, 1982, but was left in operation for rest of crop year. Pool elevator at Rounthwaite was moved to Nesbitt on CP Glenboro Sub. in Feb. 1983. Last train to Wawanesa from Brandon Dec. 29, 1983.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of Pool elevator and rebuilt boxcars, Wawanesa, Manitoba, taken along the CNR line, Wawanesa substation.
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of CP Ex.W. 5913-5954-6008-5696, arriving at Solsgirth, Manitoba. Image was taken along the CPR Minnedosa & Bredenbury subdivision (ex. Manitoba & N.W. Railway).
Stuckey's notes: Contract for concrete approach from north end to replace east and west timber approaches along Assiniboine Ave. awarded to A.E. Jones and E. Fulcher for $30,590. Oct. 11, 1934. (Brandon Sun). As part of this project a Z-shaped ramp on the west side to Assiniboine Ave for pedestrians replaced wooden stairs to north end. G. Crighton Collection.
Scope and Content
Photograph was taken from the east side of Pacific Avenue and shows the pedestrian stairway to the North end and a CPR early 2800 being serviced in Train No. 4.
Notes
Corresponds with negative 1-2002.3.9.BF2.
Repro Restriction
The McKee Archives is the copyright holder for the Stuckey materials.
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of CP 2nd 82: 5606-5008-5730-5722, arriving at Solsgirth, Manitoba. Image was taken along the CPR Minnedosa & Bredenbury subdivision (ex. Manitoba & N.W. Railway).