[According to Mr. Stuckey] it snowed continuously from Oct. 7 to 10th, giving [Brandon] the heaviest snowfall ever recorded in October - must have been about 40".
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Canadian National Railway [passenger train] No. 6, with engines 1905 and 1906, in snow at station.
Notes
In this photo CNR No. 6 Edmonton-Regina-Winnipeg is running 10 hours late as an Extra train
[Note that the train has backed into the station located on Ninth Street, adjacent to the Prince Edward Hotel. P.E. 28/07/09.]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station in Brandon, Manitoba.
Notes
[Looking southeast; Pacific Avenue was located directly north (left) of the station and tracks. P.E. 30/07/09]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station at Boissevain, Manitoba.
Stuckey's notes: During World War II dances were held nightly on the second floor, well patronized by the boys from RCAF No. 10 Service Flying Training School (SFTS) Dauphin and RCAF No. 7 Bombing & Gunnery School (B&G) Paulson. While on course at No. 7 B&G I attended often - great times!
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of the town hall at Dauphin, Manitoba, taken along the CNR line, Gladstone substation.