[According to Mr. Stuckey] it snowed continuously from Oct. 7 to 10th, giving [Brandon] the heaviest snowfall ever recorded in October - must have been about 40".
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Canadian National Railway [passenger train] No. 6, with engines 1905 and 1906, in snow at station.
Notes
In this photo CNR No. 6 Edmonton-Regina-Winnipeg is running 10 hours late as an Extra train
[Note that the train has backed into the station located on Ninth Street, adjacent to the Prince Edward Hotel. P.E. 28/07/09.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Canadian Pacific Railway Station looking west from overhead [Eighth Street] bridge
Notes
Date determination: Engine 93 (ex 375) received Series 2 numbering in Sept. 1907 and repainting is still clean; some trees have leaves so could be Sept. 1907 but more likely May 1908.
[For specific information regarding this photo (which was used to create a postcard) see "Brandon History in Postcards" by Jack Stothard, Manitoba History, Number 56, October 2007, page 35. P.E.]
Photo shows all that remains of the pre-1911 station. The east side was removed in 1960s to build a crew hostel (bunkhouse). This yard office on the west side was part of an extension and rebuild in 1904.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
West side of Canadian Pacific Railway Station
Notes
[Westbound train] Extra 3001 - 8617 has stopped to change crews
[Mr. Stuckey numbered two envelopes P24. We have kept the same number but designated the first envelope P24(1) and the second envelope P24(2).]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern [gas-electric power unit] 2327 & Train at Rugby, ND.
Notes
Built by Brill/Westinghouse in June of 1928; scrapped June 1956. This unit ran with a similar train to Brandon, Manitoba from 1929 until 1936.
Stuckey's notes: Spur from M and B Junction to Wawanesa was designated as closed Dec. 31, 1982, but was left in operation for rest of crop year. Pool elevator at Rounthwaite was moved to Nesbitt on CP Glenboro Sub. in Feb. 1983. Last train to Wawanesa from Brandon Dec. 29, 1983.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of Pool elevator and rebuilt boxcars, Wawanesa, Manitoba, taken along the CNR line, Wawanesa substation.