Mr. Stuckey's notes: On bridge mile 87.2, Bredenbury Sub[division]. Has permanent 10 MPH slow order [on] account [of] footings in shale.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of CP XW 6015-5701-5929-5747-QNS&L 215-6037, Harrowby, Manitoba. Image was taken along the CPR Minnedosa & Bredenbury subdivision (ex. Manitoba & N.W. Railway).
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of CP Ex. W. 6015-5701-5929-5747-QNS&L 215-6037, Glossop, Manitoba. Image was taken along the CPR Minnedosa & Bredenbury subdivision (ex. Manitoba & N.W. Railway).
Stuckey's notes: Spur from M and B Junction to Wawanesa was designated as closed Dec. 31, 1982, but was left in operation for rest of crop year. Pool elevator at Rounthwaite was moved to Nesbitt on CP Glenboro Sub. in Feb. 1983. Last train to Wawanesa from Brandon Dec. 29, 1983.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of Pool elevator and rebuilt boxcars, Wawanesa, Manitoba, taken along the CNR line, Wawanesa substation.