Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph shows a portion of the Great Northern Railway track with the Bunclody bridge in the background. Also visible are a couple of houses, railway cars, lumber and part of the Souris River. The photograph was taken in early winter or early spring.
Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph shows the members of gang 19, who built the Great Northern Railway bridge or trestle at Bunclody. Back Row (7th person from the left): Sig Hongslo (Amneia, N. Dakota). Front Row (1st on left): Dave Pringle (Minto, MB); (6th from left) Jack Blodgett (Heaslip, MB).
Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph is a close-up of the Great Northern Railroad bridge or trestle at Bunclody under construction. There are two men standing on the support structure.
Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph shows a moveable crane used for railway maitenance on the Great Northern Railway bridge at Bunclody, MB. The photograph was taken from the Souris River and shows the bridge structure.
Stuckey's notes: Spur from M and B Junction to Wawanesa was designated as closed Dec. 31, 1982, but was left in operation for rest of crop year. Pool elevator at Rounthwaite was moved to Nesbitt on CP Glenboro Sub. in Feb. 1983. Last train to Wawanesa from Brandon Dec. 29, 1983.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of Pool elevator and rebuilt boxcars, Wawanesa, Manitoba, taken along the CNR line, Wawanesa substation.
Stuckey's notes: Elevator on right moved to Nesbitt. Other scrapped. Wawanesa spur (remainder of CN Belmont branch) closed end 1982 crop year, summer 1983. Mainline modeller, October 1982.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of Manitoba Pool elevators, Rounthwaite, Manitoba, taken along the CNR line, Wawanesa substation.
Stuckey's notes: Elevator on right moved to Nesbitt. Other scrapped. Wawanesa spur (remainder of CN Belmont branch) closed end 1982 crop year, summer 1983. Mainline modeller, October 1982.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of Manitoba Pool elevators, Rounthwaite, Manitoba, taken along the CNR line, Wawanesa substation.
Stuckey's notes: Beulah was terminal of CN Rapid City subdivision from Hallboro Junction. Service ended in 1978.[ Mr. Stuckey consistently spelt it "Buelah"]
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of an old Manitoba Pool elevator #44, Beulah, Manitoba, taken along the CNR line, Rapid City subdivision.
Stuckey's notes: This is closest point on CN Rossburn Subdivision to CP Minnedosa Subdivision. Bill McGuire and I figured they are about 3 miles apart here. The long range plan is for a cutoff joining the two near this point. Track from here to Rossburn Junction is not being improved.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of the Pool elevator (closed), mile 5 Rossburn subdivision, Springhill, Manitoba, taken along the CNR line, Rossburn subdivision.