Skip header and navigation

Revise Search

8 records – page 1 of 1.

Education Building

http://archives.brandonu.ca/en/permalink/descriptions8277
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
GMD
graphic
Date Range
1967-1978
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
Series Number
2.7
GMD
graphic
Date Range
1967-1978
Physical Description
10 photographs
History / Biographical
The Education Building was completed in 1966. It is located between Clark Hall and the Health Studies Complex.
Scope and Content
Sub-series consists of photographs of the Education Building.
Show Less

Citizens' Science Building and Knowles-Douglas buildings

http://archives.brandonu.ca/en/permalink/descriptions8274
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
GMD
graphic
Date Range
c.1980s - c.1990s
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
Series Number
2.3
GMD
graphic
Date Range
c.1980s - c.1990s
Physical Description
5 photographs
History / Biographical
The Citizens' Science Building was built in 1922 and financed by Brandon citizens. It was renamed the Knowles-Douglas Student Union Centre c. 1984 in honour of Brandon College graduates Stanley Knowles and Tommy Douglas, both of the Class of 1930. The Knowles-Douglas Addition was completed in 1987.
Scope and Content
Sub-series consists of photographs of the Citizens' Science Building and the Knowles-Douglas buildings, which include the Knowles-Douglas Student Union Centre and the Knowles-Douglas Addition.
Show Less

Brandon College Building and Clark Hall

http://archives.brandonu.ca/en/permalink/descriptions8273
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
GMD
graphic
Date Range
c.1909 - 1996; predominant 1960s - 1996
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
Series Number
2.2
GMD
graphic
Date Range
c.1909 - 1996; predominant 1960s - 1996
Physical Description
116 photographs
History / Biographical
BRANDON COLLEGE BUILDING The construction of the Brandon College Building, also known as the Original Building, was primarily financed by Mr. and Mrs. William Davies, a Toronto based Baptist meat packer, and his sister Mrs. Emily Davies, also of Toronto, who pledged $5,000 a year for five years to the new Baptist College. Four city blocks between 18th and 20th streets were purchased for the College campus and the tender of Messrs. T.M. Harrington of Winnipeg was accepted in the spring of 1900; Mr. Hugh McCowan of Winnipeg appointed as architect. Mrs. Davies laid the cornerstone for the Brandon College Building on July 13, 1900. The Brandon College Building was conceived as a substantial five story brick structure with a stone basement. The Tyndall Manitoba quarries, located thrity miles northeast of Winnipeg, supplied the stone and presented the College with the stone steps at the main entrance. The basement contained the dining room, kitchen, laundry, furnace room, a science laboratory, and maids' rooms. The first floor housed the reception room, office, library, four classrooms and the teachers' cloak rooms. The second floor had five classrooms, a reading room, five rooms for resident students and a resident teacher. Teachers' rooms and seventeen rooms for students comprised the third floor; and additional thirteen rooms for residents took up the fourth floor. The residence was to house 70 men. The total cost of the building and furnishings was $44,000. The Brandon College Building was ready for occupancy by October 1, 1901. CLARK HALL The cornerstone of Clark Hall was laid by Mrs. A.P. McDiarmid, wife of the Principal of Brandon College, on May 24, 1906. The residence was officially opened on Thanksgiving Day, October 18, of the same year. The construction of the building grew our of a demand for a ladies' college. A canvass made in Eastern Canada had resulted in subscriptions totaling $10,000. When Dr. McDiarmid reported the results of the canvass to the Chairman of the Board, Dr. C.W. Clark of Winnipeg, Clark proposed that he and his wife be allowed to provided the balance of the funds, some $30,000. While presenting the building at the opening ceremony, Clark stated that the reason for his donation was his belief in the power of cultured womanhood - he believed "that refined and Christian mothers were the strength of a nation and that he wished to see in Brandon a chool of learning for women in which every Christian virtue and grace might be illustrated." Clark Hall was built immediately north of the Brandon College Building and was connected to it by classrooms and the iron door with its door bell, which was rung by gentlemen before being admitted. It is a five story brick building, with fittings of imported Georgia pine. In the basement was the gymnasium, studios and maids' rooms. On the main floor was a spacious reception room furnished by the Honorable A.C. Rutherford, the Premier of Alberta and the Lady Principal's suite, furnished by Mrs. N. Wolverston, wife of the treaurer of the College Board. Music studios and the offices of the resident matron were also on the main floor. The second and third floors were dormitories. The fourth floor was meant to be art studios, but due to registration demands, it was divided into students' rooms. The residence was designed to house fifty students and seven teachers. Piano practice areas were also designated on the west side of the building and on the groundlevel half way between the basement and the first floor. BRANDON COLLEGE BUILDING AND CLARK HALL RESTORATION PROJECT By the early 1990s, it was clear that major reconstruction work on the Brandon College Building and Clark Hall was necessary if the buildings were to remain in use. The alternative was to demolish both buildings and construct a new central administrative structure for the campus. Because of the historic character of the two original campus buildings, the decision was taken to mount a complete restoration of the structures that involved a complete removal of everything except for the surrounding brick fascade and the construction of new buildings within the old external walls. This project was financed by the Provincial government of Manitoba, who granted the University approximatley 10 million dollars. The Chief Architect for the restoration was George Cibinal. Work began in 1996 and was completed by the fall of 1997. In addition to the restoration of the Brandon College Building and Clark Hall, a new entrance was built on the west side of the buildings, as well as an addition to Clark Hall, which included a skywalk connecting it to the A.E. McKenzie Building.
Scope and Content
Sub-series consists of photographs of the Brandon College Building and Clark Hall.
Notes
History/Bio information was taken from Brandon College: A History, 1899-1967 by C.G. Stone and F. Joan Garnett (Brandon, Manitoba: Brandon University, 1969), chapters 2 and 3. Tom Mitchell provided history/bio information on the restoration project.
Images
Show Less

Crepeele locale Radiocarbon Report II

http://archives.brandonu.ca/en/permalink/descriptions11969
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2003-2008
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.5.2
Accession Number
1-2010
GMD
multiple media
Date Range
2003-2008
Physical Description
8 pages
Material Details
Radiocarbon date reports have been scanned in multi-page PDF files.
History / Biographical
Crepeele locale Radiocarbon Dates. C14 report by Beta Analytic Inc. for Crepeele site XU 48 and Graham site XU 54. From 2003 to 2008 field work took place at the Crepeele locale with 75 - 1m x1m units excavated. To help establish the cultural sequence at the locale Radiocarbon dates were obtained from the three sites in the Crepeele locale. Radiocarbon dating The technique of radiocarbon dating was developed by Willard Libby and his colleagues at the University of Chicago in 1949. Radiocarbon dating is used to estimate the age of organic remains from archaeological sites. Organic matter has a radioactive form of carbon (C14) that begins to decay upon death. C14 decays at a steady, known rate of a half life of 5,730 years. The technique is useful for material up to 50,000 years. Fluctuations of C14 in the atmosphere can affect results so dates are calibrated against dendrochronology. Radiocarbon dates are calibrated to calendar years. Dates are reported in radiocarbon years or Before Present. Before Present refers to dates before 1950. The introduction of massive amounts of C14, due to atomic bomb and surface testing of atomic weapons, has widely increased the standard deviation on all dates after A.D. 1700 causing these dates to be unreliable. Accelerated mass spectrometry can more accurately measure C14 with smaller samples and can date materials to 80,000 years.
Scope and Content
Sub sub series contains radiocarbon dates from: Crepeele, Sarah and Graham sites.
Name Access
Crepeele locale Radiocarbon Report II
Subject Access
Archaeology Crepeele locale Crepeele locale Radiocarbon Dates
Documents

1.5.2_Crepeele08_RC14.pdf

Read PDF Download PDF
Show Less

A.E. McKenzie Building and George T. Richardson Centre

http://archives.brandonu.ca/en/permalink/descriptions949
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
GMD
graphic
Date Range
c. 1959 - 1995
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
Series Number
2.4
GMD
graphic
Date Range
c. 1959 - 1995
Physical Description
43 photographs
History / Biographical
The J.R.C. Evans Lecture Theatre and the A.E. McKenzie Building were both completed in 1960. The Evans Theatre is named for John Robert Charles Evans, who served as president of Brandon College from 1928 to 1959. The A.E. McKenzie Building was originally the Library and Arts building, and was named for A.E. McKenzie, a local businessman and supporter of the College. The George T. Richardson Centre, which includes the Evans Theatre and the John E. Robbins Library, was completed in 1993.
Scope and Content
Sub-series consists of photographs of the A.E. McKenzie Building, the George T. Richardson Centre, the J.R.C. Evans Lecture Theatre, the John E. Robbins Library and the link between the Evans Theatre and the McKenzie Building.
Show Less

Atkinson II site DiMe-27 2004

http://archives.brandonu.ca/en/permalink/descriptions12223
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2004
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
2.1.3
Accession Number
1-2010
GMD
multiple media
Date Range
2004
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
After the flooding of the Souris River in 2004 receded, Tomasin Playford and her crew of Andrea Richards, Sarah Graham and Shane Kolesar returned to the Atkinson site and commenced cleaning up the earlier excavation of Atkinson. An area east of the Atkinson excavations was also opened for testing in 2004. This area was designated as Atkinson II. In some of the field notes it is referred to as Atkinson East. A test block was opened and fenced off from the cattle with snow fence. A 4m2 block was surveyed in (units 13 - 16) and two partial units that were truncated by the riverbank (units 11 &12) were also placed to the south of the 4m2 block. Three of the students who had completed the recent field school were hired as crew. Jessica McKenzie, Evie Fevez and Emily Ansell joined the crew at the Atkinson II site. Recoveries from XU 13 - 16: Large bison bone was recovered from units 11 and 12 and a metal tobacco box seal was recovered from unit 12. More small pieces of metal found in levels 2 and three together with small bone fragments. A bone fragment with butchering marks from a metal tool was recovered from level 6 and pottery was found in level 9. A few lithic flakes were found in level 13 and in a trench at the bottom of unit 13 above a calcite cemented layer. Recoveries from these tests were sparse and diminished as the excavation series became more distant from the river. It is likely that the remains that were recovered represent the northern edge of these occupations. The upper occupation at Atkinson II appears to be an early historic occupation with a sparse scatter of bone and a few pieces of metal. The lower layers, below level 7 are likely precontact. Units 9 and 10 were dug as test pits and produced very little in the way of cultural materials.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journals are daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Atkinson II site DiMe-27 2004
Subject Access
Archaeology North Lauder locale Atkinson site DiMe-27 Atkinson II site 2004
Show Less

Atkinson II site 2004 - summary information

http://archives.brandonu.ca/en/permalink/descriptions12224
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Date Range
2004
{add= ARCH 2 North Lauder Locale 2.1 Atkinson DiMe-27 2.1.3 Atkinson site II 2004
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
2.1.3.1
Date Range
2004
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format
History / Biographical
An area east of the Atkinson excavations was also opened for testing in 2004. This area was designated as Atkinson II and a test block was opened and fenced off from the cattle with snow fence. A 4m2 block was surveyed in (units 13 - 16) and two partial units that were truncated by the riverbank (units 11 &12) were also placed to the south of the 4m2 block. Test units 9 and 10 were also excavated.
Name Access
Atkinson II site 2004 - summary information
Subject Access
Archaeology North Lauder locale Atkinson site DiMe-27 Atkinson II site 2004 - summary information
Documents

2.1.3.1_Crew_Unit.pdf

Read PDF Download PDF
Show Less

Physical Plant buildings

http://archives.brandonu.ca/en/permalink/descriptions8281
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
GMD
graphic
Date Range
1962 - 2010
Part Of
BUPC 2 Campus buildings
Description Level
Sub-series
Series Number
2.12
GMD
graphic
Date Range
1962 - 2010
Physical Description
30 photographs
History / Biographical
Physical Plant provides security, workplace health and safety, building maintenance, utilities, cleaning, groundskeeping, and key storage services, as well as capital project management for the Brandon University campus. It includes the new Physical Plant building and new steam plant on 20th Street and the Site Services building on the corner of 20th Street and Louise Avenue. Prior to the opening of the new Physical Plant building in 2010, services were operated out of World War II era H-Huts in the centre of campus. The original steam plant (1962-1990s) was sold following the construction of the new steam plant.
Scope and Content
Sub-series consists of photographs of Physical Plant buildings including: the original Steam Plant; the (new) Steam Plant; the Site Services Building; the Physical Plant H-Hut; and the new Physical Plant building.
Show Less

8 records – page 1 of 1.