For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a). JA4(1) and JA4(2) is a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a). JA4(1) and JA4(2) is a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put a negative in the envelope and taped the print to the outside. We have separated them and numbered the negative D13(1) and the print D13(1a).]
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put a negative in the envelope and taped the print to the outside. We have separated them and numbered the negative D13(1) and the print D13(1a).]
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant.
Notes
Writing on the back of the photograph reads: "10 mile dam". Biographical information obtained from Manitoba Historical Society.