This consists of a series of four blueprints for the proposed new science building: third floor organic chemistry; second floor biology lab; first floor, advanced optics, general physical laboratory; basement.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
A series of thirteen blueprints was prepared for the proposed new lecture building and theatre. Blueprints four and eleven are missing from this collection. Those included provide a plot plan for the buildings within the general campus and individual schedules showing various features of the new buildings.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Brandon University [Brodie Science Centre (foreground), McMaster Hall (background)]
Notes
Construction of new [Brodie Science Centre].
[Note McMaster Hall under construction in background.]
[Mr. Stuckey put two negatives in the same envelope and taped the prints to the outside. We have separated them and numbered the negatives DA9(1) and DA9(2), and the prints DA9(1a) and DA9(2a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Brandon University [Brodie Science Centre (foreground), McMaster Hall (background)]
Notes
Construction of new [Brodie Science Centre].
[Note McMaster Hall under construction in background.]
[Mr. Stuckey put two negatives in the same envelope and taped the prints to the outside. We have separated them and numbered the negatives DA9(1) and DA9(2), and the prints DA9(1a) and DA9(2a).]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.