For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a). JA4(1) and JA4(2) is a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a). JA4(1) and JA4(2) is a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Photograph was given to Fred McGuinness by Linda Bilkoski (nee Lepard) of Lac du Bonnet, MB.
Scope and Content
Photograph shows the wooden exterior of Brandon Fire Hall No. 2 before it was covered with a brick veneer. The firemen are standing outside the bay doors which are open and blocked with rope. The hose wagon and ladder wagon are parked inside the building. The harnesses for the horses are suspended from the ceiling.
Notes
Writing on the back of photograph reads: Mrs. Ed Harden. No. 2 Firehall, 600 Block 11th Street, Brandon, Man. This picture is the same as the negative in the Lawrence Stuckey collection. Stuckey obtained a copy of the photo from George Lepard, father of Linda Bilkoski (nee Lepard).