G.A. Brakeley & Co. Ltd. were retained by the Board of Directors of Brandon College in June 1958 to conduct a survey, make an analysis and prepare a plan in respect of a campaign for the purpose of raising capital funds.
Storage Location
RG 6 Brandon University fonds
Series 4: Office of the Vice-President
4.2 Office of the Vice-President (Administration & Finance)
Box 4
pages 26-34 and an Addendum setting out tender terms for construction of proposed new Science Building.
Physical Condition
Generally good.
Scope and Content
Document sets out requirements - materials and methods and conditions of construction - for the proposed new science building at Brandon College. Documentation includes electrical fixtures, heating and plumbing.
Storage Location
RG 6 Brandon University fonds
Series 2: Board of Governors
2.1 Documents