Primary exercises in arithmetic : no. 5 : fourth year, first half : exercises on the simple rules : multiplication by factors and two figures : division by factors without remainders : sight exercises on the tables of time, length, etc. : notation and numeration up to six places : abundance of sight work
Primary exercises in arithmetic : no. 6 : fourth year, second half : simple rules : multiplication by two and three figures : division by factors with remainders : long division : notation and numerotation up to nine places : sight work
The elements of pedagogy : a manual for teachers, normal schools, normal institutes, teachers' reading circles, and all persons interested in school education
Photograph was given to Fred McGuinness by Linda Bilkoski of Lac du Bonnet, MB.
Scope and Content
Photograph shows a studio portrait of moustached wearing a three-piece suit, seated with six girls. The girls are wearing dresses, ribbons in their hair, and several have broaches pinned at their necks.
The united and much admired system of arithmetic and mental calculations of Doctor Willcolkes and Messrs. T. and T.W. Fryer : being the result of many years' study
Euclid's Elements of geometry : the first six books, chiefly from the text of Dr. Simson, with explanatory notes, a series of questions on each book, and a selection of geometrical exercises from the Senate House and College examination papers, with hints, etc., designed for the use of the junior classes in public and private schools
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant.
Notes
Writing on the back of the photograph reads: "10 mile dam". Biographical information obtained from Manitoba Historical Society.
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant. The dam's timber construction is quite evident in the picture.
Notes
Writing on the back of the photograph reads: McGuinness (Manitoba Hydro), on Little Saskatchewan.
Photograph sent to Fred McGuinness from Leila McDiarmid Leck of Mission, BC, on 08 Feb 1983 in response to his Park School column (see F.A. Rosser, “Sunbeams – Park School reminiscences from a far away friends, Brandon Sun 25 Jan 1983)
Scope and Content
Photograph shows a group of co-ed students standing on a sidwalk between two railings. Students have been identified as: Glen Speers, Clifford Kitson, Rae McKenzie, Ellis McLaren, Shirley Lane, Beth (Babs) Kingston, Helen Tackaberry, Mina Collins, Mary Watson, Thelma Brownell, Jean Muirhead [dark head], Mary McDonald, Lorna Lawrence, Leila McDiarmid, Eleanor Wyre [head], Eleanor Sellers, Beth Crawford [head], Margaret Robinson, Florence Roberts, Eileen Muirhead? [head], Beulah Cristal, Marjorie Carruthers, Josephine Hamm [dark head], Dorothy Tinline?, Mary Wgner, Clayton Copp, Bob Epton, Howard Bell, and Anna Roberts in front.
Notes
Signatures of the students are on the back of the photograph. Names of obtained from correspondence dated 08 Feb 1983 to Fred McGuinness from Leia McDiarmid Leck.