Physical Plant provides security, workplace health and safety, building maintenance, utilities, cleaning, groundskeeping, and key storage services, as well as capital project management for the Brandon University campus. It includes the new Physical Plant building and new steam plant on 20th Street and the Site Services building on the corner of 20th Street and Louise Avenue. Prior to the opening of the new Physical Plant building in 2010, services were operated out of World War II era H-Huts in the centre of campus. The original steam plant (1962-1990s) was sold following the construction of the new steam plant.
Scope and Content
Sub-series consists of photographs of Physical Plant buildings including: the original Steam Plant; the (new) Steam Plant; the Site Services Building; the Physical Plant H-Hut; and the new Physical Plant building.
Educaton Bldg.Faculty Activities: Educational Activities. Top centre picture: David Eaton instructor, Centre right picture: Mike Spack, on the left. Bottom right picture: Mike Spack, on the left.
Photograph is looking west southwest and shows the Education Building, including the main entrance. Photograph was taken before the construction of the wheelchair ramp (built in the mid 1980s).
Files consist of blueprints, building specifications, proposed plans for the new Education building, timelines, General Faculty Council meeting minutes, building notices, correspondence, samples, memos, and tenders.
Storage Location
RG 6 Brandon University fonds
Series 4: Office of the Vice-President
4.2 Office of the Vice-President (Administration & Finance)
Box 3