According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 538
Notes
Great Northern Railway engine 538 was a class F-1 2-8-0 ["Consolidation" type], and often worked freight trains to Brandon.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway engine 716
Notes
Great Northern Railway 4-8-0 class G-3 locomotives were known to have worked freight trains to Brandon.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station in Brandon, Manitoba.
Notes
[Looking southeast; Pacific Avenue was located directly north (left) of the station and tracks. P.E. 30/07/09]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of the Great Northern Railway's station at Boissevain, Manitoba.
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Early Brandon team of 10 "M", Davidson & Gowen, Brandon
Notes
[Mr. Stuckey put 3 negatives in the same envelope, numbering them AH6b, AH6c, and AH6d. We have separated them, keeping his original numbering. We suspect that all three negatives display Brandon lacrosse teams, although negatives AH6b and AH6d are not identified as such.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Early Brandon team of 13; activity not apparent.
Notes
[Mr. Stuckey put 3 negatives in the same envelope, numbering them AH6b, AH6c, and AH6d. We have separated them, keeping his original numbering. We suspect that all three negatives display Brandon lacrosse teams, although negatives AH6b and AH6d are not identified as such.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
The Quebec "Bulldogs" hockey team
Notes
Several Brandon players (names on); There are two copy negatives, with AH10a being the smaller neg.; Source: A. Gurba; [Mr. Stuckey put 2 negatives in the same envelope, numbering them AH10 and AH10a. We have separated them, keeping his original numbering.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
The Quebec "Bulldogs" hockey team
Notes
Several Brandon players (names on); There are two copy negatives, with AH10a being the smaller neg.; Source: A. Gurba; [Mr. Stuckey put 2 negatives in the same envelope, numbering them AH10 and AH10a. We have separated them, keeping his original numbering.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Shea's Hockey Team 1930-1931, Brandon Big Four League
Notes
Third row: Tommy Jarvis (executive), Emile Sebastian (coach), Mack Senkbiel (trainer); Second row: ?, Russ Hawson, Andy Murray (Brewery boss), Bill Mutter, Ed Riley; First row: Cam Hawson, Elmer Cook, Cecil Gardner (Goal from Virden), Bert Collins (Scotty), Brick Metson. Mascot: ?
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway steam shovel.
Notes
Used in the construction of the Brandon, Saskatchewan and Hudson's Bay Railway at Bunclody, Manitoba
Great Northern Railway photo
From the collection of Gilford Copeland of Bunclody, Manitoba
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway freight shed, Brandon, Manitoba.
Notes
Office end (foreground) razed 1984; remainder demolished January 8, 1986.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway Weed Burner, Rugby, ND.
Notes
The Great Northern used the same unit on its line to Brandon.
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Early Brandon "C.O." Lacrosse Team
Notes
[Mr. Stuckey put 3 negatives in the same envelope, numbering them AH6b, AH6c, and AH6d. We have separated them, keeping his original numbering. We suspect that all three negatives display Brandon lacrosse teams, although negatives AH6b and AH6d are not identified as such.]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway steam shovel & earth cars.
Notes
Used in the construction of the Brandon, Saskatchewan and Hudson's Bay Railway at Bunclody, Manitoba
Great Northern Railway photo
From the collection of Gilford Copeland of Bunclody, Manitoba
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
This engine was built by Brooks in March of 1883 as No. 887 and marked as scrap [by the GN] in 1937. This engine is known to have worked passenger trains to Brandon. This class of locomotive was replaced by gas-electric [power units] in 1929 but they would be used if no gas-electric was available. Engine 185 sat dead in Minot from the closing of the Brandon line until it was scrapped.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Engine 185, a class B-19 4-4-0 ["American"] type at Minot, ND.
Notes
Small copy neg. Quote in HistoryBio taken from Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.