Brandon's first church; Showing renovations of 1895; A new building started construction in 1898, its cornerstone laid in 1899 by Mrs. Clifford Sifton.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
First Methodist Church, 1881-1899
Notes
Located on 7th St. between Lorne & Louise Ave's.
People in photo, L to R: Mrs. Adams, Mrs. Leegh, Mrs. Van Tassel, Mrs. Ashley, B. Trotter, Mrs. Trotter, Rev. Leonard Gaetz, Mrs. Bodden, Rev. Darrel, J. Sproul, E. Bennest, D. Reesor, Mr. Bodden, T. Butcher; From collection of Central United Church.
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Brandon Hills Church
Notes
View from northwest showing part of cemetery. Best neg.
[Mr. Stuckey had taped a print to the outside of the envelope. We have separated the negative and the print, numbering them OA3(1) and OA3(1a) respectively.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Brandon Hills Church
Notes
View from northwest showing part of cemetery. Best neg.
[Mr. Stuckey had taped a print to the outside of the envelope. We have separated the negative and the print, numbering them OA3(1) and OA3(1a) respectively.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Interior of Brandon Hills Church
Notes
[Mr. Stuckey had taped a print to the outside of the envelope. We have separated the negative and the print, numbering them OA7(1) and OA7(1a) respectively.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Interior of Brandon Hills Church
Notes
[Mr. Stuckey had taped a print to the outside of the envelope. We have separated the negative and the print, numbering them OA7(1) and OA7(1a) respectively.]
View is looking east southeast. Photograph shows the Western Manitoba Centennial Auditorium (WMCA) under construction. There are two signs in the foreground. One lists the names of the architectural firm, the engineers, contractiors and subcontractors involved with the project. The other reads: Site of Western Manitoba's 100 Centennial Project New Auditorium