For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of Prince Edward Hotel under construction.
Notes
For details regarding construction negotiations between the City of Brandon and Canadian Northern Railway, see Brandon: A City, by G.F. Barker, page 126.
Excavated earth was loaded into a hopper, which itself was on a rail running a half block back. It was then dumped back to fill the trench where pipe installation had already been completed - Art Baker (of Art's Confectionery, NE 15th St. & Princess Ave.). This information was provided in response to a request in the Brandon Sun (Fred McGuinness) for further information.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Brandon sewer line construction
Notes
View of Pacific Avenue, looking east from 5th Street
Stuckey's notes: built in 1892 of field stone. Typist's note: There is a common misconception that this house was the Anglican manse. Although it was built around the same time, it was never owned by the church and was always a private residence. Natalie Griffith.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of St. Mary's Anglican church and manse, taken along the CPR Broadview substation rail lines.