Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
"Paper presented at the Association of Cooperative Educators Conference, Banff, Alberta"
"The research for this paper was made possible by a grant from the Cooperative College of Canada, Saskatoon, Saskatchewan and is one in a series written from this study"
The Crystal Palace was built in 1904 ((Nor'West Farmer 20/08/1904); "Finishing touches" applied 1913 (Barker, p. 154); Demolished, but material saved, in 1939.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of Crystal Palace at Brandon fairgrounds
Notes
[Images M28 and M29 are both on one 3 1/2" x 5" negative.]
Portrait of the Brandon University Bocats men's hockey team. Front Row (L to R): Colin Ryder, Jeff Schachterle, Ian Lampshire, Chris Wielgosh, Craig Anderson, Ryan Vermette, Heath Butler. Middle Row (L to R): Rob Stouffer (Trainer), Trevor Ross (Equipment Manager), Tom Skinner (Head Coach), Lewis Kinvig, Craig Malaschuk, Chad Yeomans, Chad Hackywicz, Curtis Menzul, Gregg Zubricki, Ty Davidson, Bryan Webber (Ass’t Coach), Wayne Robertson (Manager), Rob Wasylniuk(Ass’t Coach). Back Row (L to R): Tyson Ramsey, Ryden Marko, Derek Henkelman, Scott Hlady, Chris Kavanaugh, Darren Kirk.
Portrait of the Brandon University Bocats men's hockey team. Front Row (L to R): Colin Ryder, Scott Hlady, Craig Anderson, Chris Wielgosh, David Andrew, Ryden Marko, Curtis Atkinson. Middle Row (L to R): Rob Wasylniuk (Ass’t Coach), Rob Stouffer (Trainer), Tom Skinner (Head Coach), Chad Leslie, Greg Zubricki, Daryl Stockham, Brent Kyle, Curtis Menzul, Trevor Wideman, Craig Malaschuk, Bryan Webber (Ass’t Coach), Trevor Ross (Equipment Manager), Brad Wells (Ass’t Coach). Back Row (L to R): David Caldwell, Mike Baranyk, Scott Ribble, Derek Henkleman, Ryan Vermette, Marlin Murray, Tyson Ramsey.