Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a). JA4(1) and JA4(2) is a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a). JA4(1) and JA4(2) is a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Manitoba Hydro transmission lines
Notes
[Mr. Stuckey put six negatives and three prints in same envelope. We have separated them and numbered the negatives JA4(1) through JA4(6) and the prints JA(1a) through JA(3a).]
After demise of the streetcars, a transit system was started by MacArthur Transportation Co. with three routes, an east end loop, a south end loop, and a west end loop, with terminal at 8th St. & Rosser Ave. The E & W was operated as a continuous route with two locally built coach bodies on new Maple Leaf trucks. A secondhand, larger, Leland coach was acquired for the S. end, which was replaced by a large GMC about 1938.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.