For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
[Prince Edward Hotel with CN mixed (freight and passanger) train at Canadian National Railways station.]
Notes
[Mr. Stuckey put six negatives (3 combined negatives) in one envelope. We have separated them and numbered them DC6f(1) through DC6f(6). From a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Image of CPR Highway 10 bridge (town in background) and XW 5693-5703-5918-5960-5947-3036, Minnedosa, Manitoba. Image was taken along the CPR Minnedosa & Bredenbury subdivision (ex. Manitoba & N.W. Railway).
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern (BS&HB) Railway train in deep snow.
Notes
From the collection of Gilford Copeland of Bunclody, Manitoba
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Interior of CPR roundhouse.
Notes
[Similar] photo published in Canadian Pacific in Manitoba, Volume Two, by L.A. Stuckey
[Mr. Stuckey numbered two envelopes P20. We have kept the same number but designated the first envelope P20(1) and the contents of the second envelope P20(2) and P20(3).]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Interior of CPR roundhouse.
Notes
Photo published in Canadian Pacific in Manitoba, Volume Two, by L.A. Stuckey
[Mr. Stuckey numbered two envelopes P20. We have kept the same number but designated the first envelope P20(1) and the contents of the second envelope P20(2) and P20(3).]
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern [gas-electric power unit] 2327 & Train at Rugby, ND.
Notes
Built by Brill/Westinghouse in June of 1928; scrapped June 1956. This unit ran with a similar train to Brandon, Manitoba from 1929 until 1936.
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
CPR Ice House Fire with engine 701
Notes
This large ice house, located between the CPR tracks and Assiniboine Avenue at 3rd Street, was filled with blocks of ice from the Assiniboine River each winter. It had a long high platform for [loading ice blocks into] refrigerator cars, and also handled charcoal braziers for heating these same cars in winter. The new ice house structure that was built after this fire was much smaller, as it had an artificial ice plant.
With mechanically temperature-controlled cars replacing ice-cooled refrigerators, it was demolished in the 1970's.
This photograph shows how steam switch engines were used as fire engines. A hose carried in a box under the tender was fitted into a branch of the boiler feed pipe (discharge pipe). When the injector was turned on it gave a nozzle pressure of over 200 psi.
Stuckey's notes: Extra 3001-8617 changing crews. Showing all that remains of pre-1911 station. Present yard office on west end was part of extension and rebuild of 1904. Remainder of old station, east end, removed in 1960's to build present crew hostel (bunkhouse).
Scope and Content
Photograph is looking east northeast at the CPR Station. Includes: the parking lot, a train, all that remains of the pre-1911 station and part of the CPR Station.
Notes
Corresponds with negative 1-2002.3.9.P24(2).
Repro Restriction
The McKee Archives is the copyright holder for the Stuckey materials.