In 1995 the History Department at Brandon University hosted the Northern Great Plains History Conference held annually at a university in the northern plains region of Canada or the United States. The Department of History, Brandon University hosted the conference again in September 2008.
Custodial History
Accession 34-1997 was donated to the McKee Archives ca. 1997 by members of the Department of History at Brandon University (Gerhard Ens, James Naylor, Hans Burmeister and Andrew Pernal). Accession 15-2009 was donated to the McKee Archives in May 2009 by James Naylor, Chair of the Conference Committee.
Scope and Content
Accession 34-1997 includes curriculum vitae and abstracts relating to each paper presented at the conference, copies of the program and related administrative records for the conference.
Accession 15-2009 consists of records generated during the course of preparing for and hosting the 2008 Northern Great Plains History Conference. Includes records dealing with: registration, finances (including grants), exhibitors, call for papers, program and session organization, audio visual, governing council for the conference, accomodations, participants (including curriculum vitaes, applications, proposals, abstracts), and the grad prize. Accession also contains: various tickets, programs, correspondence, papers by grad essay entrants, signs, instructions, mailing list, handouts, and reference materials (past conferences etc.)
Storage Location
RG 6 Brandon University fonds
Series 7: Faculties and Schools
7.1 Faculty of Arts
7.1.4 Department of History
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway steam shovel.
Notes
Used in the construction of the Brandon, Saskatchewan and Hudson's Bay Railway at Bunclody, Manitoba
Great Northern Railway photo
From the collection of Gilford Copeland of Bunclody, Manitoba
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway freight shed, Brandon, Manitoba.
Notes
Office end (foreground) razed 1984; remainder demolished January 8, 1986.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway Weed Burner, Rugby, ND.
Notes
The Great Northern used the same unit on its line to Brandon.
Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph is a close-up of the Great Northern Railroad bridge or trestle at Bunclody under construction. There are two men standing on the support structure.
Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph shows a moveable crane used for railway maitenance on the Great Northern Railway bridge at Bunclody, MB. The photograph was taken from the Souris River and shows the bridge structure.
The building near the back of the train was the original Salvation Army Citadel. Built in 1889, it was purchased by Wm. Graham in 1910 and moved to the west side of the 300 block of 10th St. It had to be moved to build the Prince Edward Hotel and eventually became part of "Billy" Graham's dance hall.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Northern Pacific and Manitoba Railway engine No. 5, with passenger train
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway steam shovel & earth cars.
Notes
Used in the construction of the Brandon, Saskatchewan and Hudson's Bay Railway at Bunclody, Manitoba
Great Northern Railway photo
From the collection of Gilford Copeland of Bunclody, Manitoba
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
This engine was built by Brooks in March of 1883 as No. 887 and marked as scrap [by the GN] in 1937. This engine is known to have worked passenger trains to Brandon. This class of locomotive was replaced by gas-electric [power units] in 1929 but they would be used if no gas-electric was available. Engine 185 sat dead in Minot from the closing of the Brandon line until it was scrapped.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Engine 185, a class B-19 4-4-0 ["American"] type at Minot, ND.
Notes
Small copy neg. Quote in HistoryBio taken from Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.