The Lake Talbot tresle was a point along the Algoma Central Railway line that connected the Helen Mine to the Michipicoten Harbour. It is located north of Wawa and southwest of the Helen Mine.
Scope and Content
Photograph shows several men walking a railway line. Before them is a tresle bridge.
Notes
Writing beneath the photograph in the album reads: Lake Talbott Tresle [sic.]
Oak Lake Co-operative Elevator Association Limited Organizational papers: 1947 - 1961 Directors meeting, 31 October 1947 Directors' Resolution, 18 October 1961 Minutes of the Executive Board meetings, volume 1, 20 May, 1928 - volume 2, 14 April, 1954; volume 4(?), 19 October 1960 - volume 6 (?), 24 July, 1979 Minutes of Shareholders Annual meetings, 1947 - 1949 (3 reports) Financial records and statistics Statement of surplus, 1932 - 1953 Auditors' reports, 31 July 1952 Correspondence, 18 July - 24 September 1969 Membership list, 20 October 1953 Miscellaneous Directors' attendance lists, 1963 - 1967 List of Officers and Directors, 1945 - 1946 Corporate Name: Rural Municipality of Sifton.
Sandy Lake Co-operative Elevator Association Limited Organizational papers: 1961 Directors' Resolution, 18 October 1961 Corporate Name: Rural Municipality of Harrison
Barry Burdeny, whose home was at Vita, Manitoba, won first place at age 17 (in 1962) in a school art competition with some 10,000 plus entries and a prize of several thousand dollars. He produced many paintings in the next two years and entered Brandon College in 1964. (BU Art Catalogue, 1983)
David Romeril lived in France, Bahamas, immigrated to Canada in 1960. He worked as a teacher and social worker in northern Ontario and Manitoba communities. A series of six of his watercolors has been reproduced by Leech Printing in Brandon (1996 inventory)
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway steam shovel.
Notes
Used in the construction of the Brandon, Saskatchewan and Hudson's Bay Railway at Bunclody, Manitoba
Great Northern Railway photo
From the collection of Gilford Copeland of Bunclody, Manitoba
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway freight shed, Brandon, Manitoba.
Notes
Office end (foreground) razed 1984; remainder demolished January 8, 1986.
According to Stuckey and Bain (1996), “The Brandon, Saskatchewan & Hudson’s Bay Railway was built and operated as a totally owned subsidiary of the Great Northern Railway. Construction commenced in late 1905 and by the end of 1905, less than a mile of track had been laid north of the boundary at St. John. In 1906, the remaining 68.6 miles to Brandon were laid and service commenced that year. During the Depression of the 1930s, traffic declined significantly and the entire branch was abandoned in 1936. Over much of the branch’s length, the ties and rails were laid on the prairie without ballast and today little remains of the line apart from traces where there were cuts and bridges.” (p. 18)
Stuckey, L. A., & Bain, D. M. (1996). The Great Northern and Northern Pacific railways in Canada. Calgary, Alberta: British Railway Modellers of North America.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Great Northern Railway Weed Burner, Rugby, ND.
Notes
The Great Northern used the same unit on its line to Brandon.
Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph is a close-up of the Great Northern Railroad bridge or trestle at Bunclody under construction. There are two men standing on the support structure.
Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph shows a moveable crane used for railway maitenance on the Great Northern Railway bridge at Bunclody, MB. The photograph was taken from the Souris River and shows the bridge structure.