For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
[View of Prince Edward Hotel under construction; looking south along Ninth Street.]
Notes
[Mr. Stuckey put six negatives (3 combined negatives) in one envelope. We have separated them and numbered them DC6f(1) through DC6f(6). From a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
[View of Prince Edward Hotel under construction.]
Notes
[Mr. Stuckey put six negatives (3 combined negatives) in one envelope. We have separated them and numbered them DC6f(1) through DC6f(6). From a combined negative.]
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of Prince Edward Hotel under construction.
Notes
For details regarding construction negotiations between the City of Brandon and Canadian Northern Railway, see Brandon: A City, by G.F. Barker, page 126.
Photograph is looking either north or south into the A.E. McKenzie Building (Library and Arts Building) during construction. A number of the members of the construction crew are visible.
Photograph is looking east northeast and shows the construction of the A.E. McKenzie Building (Library and Arts Building). Clark Hall is in the background.
Photograph is looking east and shows a truck and bulldozer excavating in preparation for the construction of the QEII Music Building. The A.E. McKenzie Building and Education Building are in the background.
Bunclody, MB was located near Souris, MB. The bridge in question crossed the Souris River.
Custodial History
Photograph was donated by a "Mrs. Wilson" in 1989.
Scope and Content
Photograph is a close-up of the Great Northern Railroad bridge or trestle at Bunclody under construction. There are two men standing on the support structure.