This is an artificially created series containing records retained by Manitoba Pool Elevators of official commissions, committee and inquiries that dealt directly with the organization and it's interests. Subjects include commission investigation as well and committee and inquiries into government policy and bills.
See also fonds level description of RG 4 for history/bio of MPE
Scope and Content
.This series has been divided into seven sub-series, including: (1) Royal Commission on Co-operatives, (2) Royal Commission on Manitoba Pool Elevators, (3) Transportation Commissions and Inquiries, (4) Box Car Inquiry, (5) Grain Commissions and Inquiries, (6) Agricultural Commissions and Policy, (7) Miscellaneous Committes, Commissions and Inquiries
File consists of: brochure for music competition Concours OSM 1988 Strings and Winds, score of Carleton Weir Elliott String Quartet No. 1 in c minor, press release from Canada Council Touring Office regarding Tour Organizers' Workshops at the Banff Centre School of Management.
Storage Range
MG 3 Brandon University Teaching and Administration
1.20 Francis Chaplin
Record of site excavation test unit 1at the Lovstrom survey 1985.
Scope and Content
Site records of excavation units may include: level summaries, floor plans, feature sheets, wall profiles, unit summaries and any other additional information relating to the unit.
Record of excavation unit 111 at the Crepeele site 2003.
Scope and Content
Site excavation records of excavation units may include: level summaries, floor plans, feature sheets, wall profiles, unit summaries and any other additional information relating to the unit.
Record of site excavation unit 112 at the Crepeele site 2003.
Scope and Content
Site excavation records of excavation units may include: level summaries, floor plans, feature sheets, wall profiles, unit summaries and any other additional information relating to the unit.
Record of site excavation unit 113 at the Crepeele site 2003.
Scope and Content
Site excavation records of excavation units may include: level summaries, floor plans, feature sheets, wall profiles, unit summaries and any other additional information relating to the unit.
Numerous photographs were taken during the excavation of the Crepeele site 2003. A selection of photographs of personnel performing usual field tasks such as surveying, measuring, excavating, and taking photographs were selected for the archive.
Scope and Content
Sub sub sub series consists of photographs taken during excavation of the Crepeele site 2003.
Site records have been scanned in multi-page PDF files.
History / Biographical
The Crepeele site was excavated in 2003 as Crepeele 3. Standard archaeological methods were used to excavate the units. Site records of excavation units XU 110 – 113 are in seperate pdf files.
Scope and Content
Site records of excavation units may include: level summaries, floor plans, feature sheets, wall profiles, unit summaries and any other additional information relating to the unit.
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
The Sarah site was initially chosen for excavation based on the results of the Casselman survey. The survey recovered significant amounts of faunal remains, some ceramics and lithics from the test pits. Excavations took place in 2003 at Crepeele West (Units 1-5) and Crepeele East (Units 6-9). The site was subsequently renamed the Sarah site DiMe-28.
Units 1 to 9 were excavated by supervisor James Graham and crew of Sarah Graham, Mike Evans, Todd Kristensen, Shayne Kolesar, Lisa Sonnenburg and Emily Ansell.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position.
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
The Crepeele site was identified from the results of the Casselman survey and excavated in 2003. Further units 1 to 8 were excavated in 2004. Funding was through the SCAPE project, directed by Dr. Bev Nicholson. The site was excavated by Crew Chief Tomasin Playford and crew.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position.