[Since its construction, this industrial chemical plant has been known as Hooker Chemicals, Canadian Occidental Chemicals, and Nexen Chemicals Canada. It is currently operated by Canexus Chemicals Canada. P.E. 03/07/09]
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Canadian Occidental Chemicals
Notes
[Mr. Stuckey put two negatives in the same envelope. We have separated them and numbered them HA15(1) and HA15(2).]
[Since its construction, this industrial chemical plant has been known as Hooker Chemicals, Canadian Occidental Chemicals, and Nexen Chemicals Canada. It is currently operated by Canexus Chemicals Canada. P.E. 03/07/09]
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Canadian Occidental Chemicals
Notes
[Mr. Stuckey put two negatives in the same envelope. We have separated them and numbered them HA15(1) and HA15(2).]
[Since its construction, this industrial chemical plant has been known as Hooker Chemicals, Canadian Occidental Chemicals, and Nexen Chemicals Canada. It is currently operated by Canexus Chemicals Canada. P.E. 03/07/09]
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
View of Prince Edward Hotel under construction.
Notes
For details regarding construction negotiations between the City of Brandon and Canadian Northern Railway, see Brandon: A City, by G.F. Barker, page 126.