Skip header and navigation

Revise Search

20 records – page 2 of 1.

Graham site DiMe-30

http://archives.brandonu.ca/en/permalink/descriptions11886
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub-series
GMD
multiple media
Date Range
2004-2008
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub-series
Series Number
1.4
Accession Number
1-2010
GMD
multiple media
Date Range
2004-2008
History / Biographical
The Graham site is a located adjacent to the Crepeele site towards the western end of the Crepeele locale. The Graham site was initially designated as a separate site early in the testing of the Crepeele locale due to what appeared to be a distinction between Early and Late Woodland ceramics. Subsequent testing has shown that this distinction was premature and that the cultural mosaic represented in the western section of the Crepeele locale may not readily separate in this manner. However, due to the records management that was already in place, the original separate designations have been retained. Environment Ground cover is a mosaic of aspen poplar groves and patches of mesic grass prairie. Excavation profiles indicate that this has been the situation since early precontact times, although as local climatic conditions change (primarily rainfall), the relative size of these areas and where they may have occurred also changed. The soil is aeolian sand sheet derived from delta outwash deposits along the western edge of glacial Lake Hind. The present topography is a variable dune landscape reworked by aeolian activity that creates a mosaic of microhabitats. These include forested patches in the lee of sand dunes grassland on the southern and western exposures and small damp lowlands that support balsam poplar, willows, red osier dogwood, high-bush cranberry and water birch. There is no permanent water source in the area although a small seasonal stream meanders through a damp lowland along the eastern margin of the Crepeele locale. Excavations at the Graham site took place from 2004 to 2008. Analyses of the recoveries shows that, with two exceptions, all of the occupations that have been tested produced bison foetal bone. The presence of foetal bison is a strong indicator of wintering occupations...The absence of foetal in some area does not necessarily indicate warm season occupations since these excavation series are small and the absence could be due to sample error or perthotaxic factors, such as scavenging of the fragile bone by dogs or other carnivores. From this evidence the Graham site has been interpreted as being primarily a wintering area. This is consistent with the lack of surface water (snow would serve as a substitute in winter) and the abundance of wood for fuel – a critical requirement for winter occupation. Cultural occupations date from Mortlach circa 250 B.P to woodland circa 580 B.P.
Scope and Content
Sub-series has been divided into sub sub series including: Graham 2004, Graham 2005, Graham 2006 and Graham 2008
Name Access
Graham site DiMe-30
Subject Access
Archaeology Crepeele locale Graham site DiMe-30
Show Less

Sarah site DiMe-28

http://archives.brandonu.ca/en/permalink/descriptions11829
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub-series
GMD
multiple media
Date Range
2003-2004
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub-series
Series Number
1.3
Accession Number
1-2010
GMD
multiple media
Date Range
2003-2004
History / Biographical
The Sarah site was chosen for excavation based on the results of the Casselman survey. The survey recovered significant amounts of faunal remains, some ceramics and lithics from the test pits. Excavations took place in 2003 at Crepeele West (Units 1-5) and Crepeele East (Units 6-9). The site was subsequently renamed the Sarah site DiMe-28. In 2004 another 9 units were excavated (Units 10-18). Based on the recoveries it was determined that the Sarah site is a stratified site with woodland ceramics in the upper occupation and late woodland points in both of the upper occupations. These upper occupations produced abundant bison bone including foetal bone. The lower occupations produced less bone and no foetal bone, although absence of foetal bone in the lower occupations does not necessarily indicate a warm season occupation. This could be due to sample error or perthotaxic factors such as scavenging of the fragile bone by dogs or other carnivores. The dates from the Sarah site include 550+/-40 B.P.; 1430+/-80 B.P; 2810+/-80 B.P.; 3120+/-130 B.P. The lower occupations did not yield any diagnostic materials although debitage was abundant. These occupations were most productive at the edge of the large sand dune at the southern edge of the excavations. It is assumed that the major portion of these occupations have been overridden by the dune in the past 3000 years. Heavy earthmoving equipment would be required to remove this overburden which limits the possibility of future excavation. Environment The Sarah site is a large area located at the eastern end of the Crepeele locale. Ground cover is a mosaic of aspen poplar groves and patches of mesic grass prairie. Excavation profiles indicate that this has been the situation since early precontact times, although as local climatic conditions change (primarily rainfall), the relative size of these areas and where they may have occurred also changed. The soil is aeolian sand sheet derived from delta outwash deposits along the western edge of glacial Lake Hind. The present topography is a variable dune landscape reworked by aeolian activity that creates a mosaic of microhabitats. These include forested patches in the lee of sand dunes with grassland on the southern and western exposures and small damp lowlands that support balsam poplar, willows, red osier dogwood, high-bush cranberry and water birch. There is no permanent water source in the area although a small seasonal stream meanders through a damp lowland to the east of the Sarah site.
Scope and Content
Sub-series has been divided into sub sub series including: Sarah 2003 and Sarah 2004,
Name Access
Sarah site DiMe-28
Subject Access
Archaeology Crepeele locale Sarah site DiMe-28
Show Less

Casselman survey - summary information

http://archives.brandonu.ca/en/permalink/descriptions11724
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2003
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.1.1
GMD
multiple media
Date Range
2003
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
Archaeological testing began in the Crepeele locale in May 2003 with a field crew of four members. James Graham supervised the crew and was assisted by Sarah Graham, Jollana Bishop, and Lisa Sonnenburg. Later additions to the testing team were Todd Kristensen, Michael Evans, and Emily Ansell. The methodology for this survey used an arbitrary datum and a transit to establish a grid of 30 m intervals and a shovel test every 20 m. Materials were removed and screened to a minimum depth of 50 cm below surface. All recovered materials were bagged and removed to the lab for further analysis. All information including: test pit grid co-ordinates; UTM co-ordinates for each test pit; artifact presence; excavator; vegetation; aspect; paleosol; paleosol depth; and notes, were entered into a GIS database. Approximately 600 shovel test pits were excavated and recorded in this fashion. Of the 600 shovel test pits, over 300 contained cultural materials. Based on the results of the Casselman survey several areas were designed for further testing and excavation. Crepeele West and Crepeele East were renamed the Sarah site DiMe-28) and Crepeele 3 which became the Crepeele site DiMe- 29.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journalsare daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Casselman survey - summary information
Subject Access
Archaeology Crepeele locale Casselman survey Casselman survey - summary information
Show Less
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2004
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.4.1
Accession Number
1-2010
GMD
multiple media
Date Range
2004
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
Graham units 9 and 14 were excavated with the Crepeele site in 2004 and were reassigned to the Graham site DiMe-30 keeping the same unit numbers. Tomasin Playford was crew chief in 2004. The Graham site was initially designated as a separate site early in the testing of the Crepeele locale due to what appeared to be a distinction between Early and Late Woodland ceramics. Subsequent testing has shown that this distinction was premature and that the cultural mosaic represented in the western section of the Crepeele locale does not readily separate in this manner.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journalsare daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Graham site 2004
Subject Access
Archaeology Crepeele locale Graham site DiMe-30 Graham site 2004
Show Less
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2005
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.4.2
Accession Number
1-2010
GMD
multiple media
Date Range
2005
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
The Graham site is located south of the Crepeele site. Due to the close proximity the Graham and Crepeele sites have both been the site of the Brandon University Archaeological Field School. In 2005 both sites were excavated as part of the Field School experience instructed by Denise Ens with teaching assistant James Graham Six units (XU 1-6) were excavated at the Graham site. Recoveries included faunal (mostly bison), lithics (points, scrapers), and ceramics. The Graham site was initially designated as a separate site early in the testing of the Crepeele locale due to what appeared to be a distinction between Early and Late Woodland ceramics. Subsequent testing has shown that this distinction was premature and that the cultural mosaic represented in the western section of the Crepeele locale does not readily separate in this manner.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journalsare daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Graham site 2005
Subject Access
Archaeology Crepeele locale Graham site DiMe-30 Graham site 2005
Show Less
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2006
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.4.3
Accession Number
1-2010
GMD
multiple media
Date Range
2006
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
The Graham site is located south of the Crepeele site. Due to the close proximity the Graham and Crepeele sites have both been the site of the Brandon University Archaeological Field School. In 2006 a small Brandon University Archaeology Field School was conducted at the Graham site. Four excavations (XU 7, 8 15 & 16) were completed with Denise Ens Instructor and Jessica MacKenzie Teaching Assistant. Recoveries included faunal (mostly bison), lithics and ceramics The Graham site was initially designated as a separate site early in the testing of the Crepeele locale due to what appeared to be a distinction between Early and Late Woodland ceramics. Subsequent testing has shown that this distinction was premature and that the cultural mosaic represented in the western section of the Crepeele locale does not readily separate in this manner.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journalsare daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Graham site 2006
Subject Access
Archaeology Crepeele locale Graham site DiMe-30 Graham site 2006
Show Less
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2008
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.4.4
Accession Number
1-2010
GMD
multiple media
Date Range
2008
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
In 2008 Brandon University Archaeology returned to the Crepeele locale to conduct further testing at the Graham and Crepeele sites. Four units (XU 47-49 & 53) were excavated at Graham 2008 in order to collect samples and add further data to previous excavations. The usual excavation methology was employed. The small crew was directed by Bev Nicholson with Crew of Bill Foy, Andrew Lints & Kim Harrison Recoveries included faunal (mostly bison), lithics and ceramics.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journalsare daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Graham site 2008
Subject Access
Archaeology Crepeele locale Graham site DiMe-30 Graham site 2008
Show Less
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2004
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.4.1
Accession Number
1-2010
GMD
multiple media
Date Range
2004
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
Graham units 9 and 14 were excavated with the Crepeele site in 2004 and were reassigned to the Graham site DiMe-30 keeping the same unit numbers. Tomasin Playford was crew chief in 2004. The Graham site was initially designated as a separate site early in the testing of the Crepeele locale due to what appeared to be a distinction between Early and Late Woodland ceramics. Subsequent testing has shown that this distinction was premature and that the cultural mosaic represented in the western section of the Crepeele locale does not readily separate in this manner.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journalsare daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Graham site 2004
Subject Access
Archaeology Crepeele locale Graham site DiMe-30 Graham site 2004
Show Less
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2003
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.3.1
Accession Number
1-2010
GMD
multiple media
Date Range
2003
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
The Sarah site was chosen for excavation based on the results of the Casselman survey. The survey recovered significant amounts of faunal remains, some ceramics and lithics from the test pits. Excavations took place in 2003 at Crepeele West (Units 1-5) and Crepeele East (Units 6-9). The site was subsequently renamed the Sarah site DiMe-28. Units 1 to 9 were excavated by supervisor James Graham and crew of Sarah Graham, Mike Evans, Todd Kristensen, Shayne Kolesar, Lisa Sonnenburg and Emily Ansell.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journalsare daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Sarah site 2003
Subject Access
Archaeology Crepeele locale Sarah site DiMe-28 Sarah site 2003
Show Less
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
multiple media
Date Range
2004
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.3.2
Accession Number
1-2010
GMD
multiple media
Date Range
2004
Material Details
Field journals have been scanned in multi-page PDF files. Artifact catalogues are PDF files in spreadsheet format. Photographs are in jpeg format.
History / Biographical
The Sarah site was initially chosen for excavation based on the results of the Casselman survey. The survey recovered significant amounts of faunal remains, some ceramics and lithics from the test pits. Excavations took place in 2003 at the Sarah site DiMe-28. In 2004 further excavation took place as part of a Brandon University Archaeology Field School. Units 10 to 18 were excavated with Denise Ens as the instructor and James Graham teaching assistant.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journalsare daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Sarah site 2004
Subject Access
Archaeology Crepeele locale Sarah site DiMe-28 Sarah site 2004
Show Less

Casselman survey - photographs

http://archives.brandonu.ca/en/permalink/descriptions10734
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
GMD
graphic
Date Range
2003
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub sub series
Series Number
1.1.5
Accession Number
1-2010
GMD
graphic
Date Range
2003
Physical Description
11 photographs
Material Details
JPEGs
Scope and Content
Sub sub series consists of photographs taken during the Casselman survey.
Name Access
Casselman survey - photographs
Subject Access
Crepeele locale Casselman survey
Show Less
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub-series
GMD
multiple media
Date Range
1985-1986
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub-series
Series Number
3.1
Accession Number
1-2010
GMD
multiple media
Date Range
1985-1986
History / Biographical
The Lovstrom surface collection came from small fields cleared within, and adjacent to, the major portions of the site which were excavated. The Lovstroms initial collection has since been added to by field personnel from Brandon University. The initial collections consisted of lithics and ceramics. A collection of faunal remains from the cultivated area was made by a Brandon University zooarchaeology class in 1986 which yielded specimens of elk, canid, mussels, and sucker, in addition to an expected abundance of bison. Since these materials were in a surface context, it may be that some of the faunal remains were historic. The high biodiversity and evidence of pre-Europeon contact prompted the decision to test the Lovstrom locale. Nine 1m2 units were excavated in 1985 and, in 1986, an additional 15 1m2 units were excavated for a total of 24 test units. This testing indicated the presence of a large precontact locale with lithics, woodland ceramics and large amounts of reasonably well-preserved faunal materials. The lithics indicated a late Prehistoric occupation (Nicholson 1986:35). However, the ceramics were more useful in that they identified the presence of Late Woodland cultures (Blackduck and Duckbay) and a single Middle Missouri vessel. It is believed that the Middle Missouri vessel was imported since the paste and construction/decorative technology differ distinctively from that of all other vessels recovered from the site. It was on the basis of an examination of these surface finds that the decision to test the Lovstrom site was made. These test excavations were conducted during the summers of 1985 and 1986. Field investigations through shovel tests, excavation units, and examination of rodent mounds, indicated that the cultural deposits at the Lovstrom locale extend approximately 500m north from the edge of the Souris channel and eastward for over two hundred meters from the escarpment along Jock’s Creek. The presence of dense forest vegetation covering much of the locale, and the subsurface nature of the archaeological deposits obscured surface indications. Radiocarbon dates: Test Unit 4: 1215/320 BP and Test Unit 8 1280/190 BP
Scope and Content
Sub-series has been divided into sub sub series including: Lovstrom survey 1985 and Lovstrom survey 1986
Name Access
Lovstrom survey
Subject Access
Archaeology Lovstrom locale Lovstrom survey
Show Less

Lovstrom Block A - summary

http://archives.brandonu.ca/en/permalink/descriptions12451
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub-series
GMD
multiple media
Date Range
1987
Accession Number
1-2010
Part Of
RG 7 Beverley Nicholson fonds
Description Level
Sub-series
Series Number
3.2
Accession Number
1-2010
GMD
multiple media
Date Range
1987
History / Biographical
Block A was the most southern site in the locale. The excavation block consisted of 12 contiguous 1m2 units dug in a 3m x 4m rectangle. The block was the least productive of cultural materials, and bone preservation was the poorest. Under the sod, the black loam layer appeared at 5 cm below surface, and the glacial clay at 25 cm below surface. Excavators described the soil matrix as gritty and silty, and it became concrete hard when dried. The occupation or bone layer extended from 10 to 25 cm below surface and consisted of a contiguous scatter of FCR and unidentifiable large ungulate bone which was heavily processed and intensively scavenged by carnivores. Most cultural materials were recovered within this layer. Fire cracked rock (FCR) and small burnt bone fragments were present but no intact hearths or processing features were evident. Non-cultural materials included limestone and other natural pebbles derived from the parent till. (These small limestone pebbles were apparent in the occupation layers in other blocks as well). Root and rodent disturbance was extensive throughout Block A. Most units were excavated to gravelly clay till. Nine of the twelve units were dug to level 4b, which ended at 40 cm b.s. No further excavations were done at this site. No C14 dates were taken.
Scope and Content
Sub-sub-sub series contains: Summary information of field methology, number and co-ordinates of excavations, personnel and their staff position; Field journals are daily records of recoveries, features and activities at the site; Site records include excavation level and unit summaries, feature sheets, profiles; sample records and maps; Artifact catalogues are lists and identifications of all artifacts recovered; Photographs are of excavation units, features, the landscape and personnel.
Name Access
Lovstrom Block A - summary
Subject Access
Archaeology Lovstrom locale Lovstrom Block A
Show Less

MPE B 3 Local Association minutes Box 3

http://archives.brandonu.ca/en/permalink/descriptions10020
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
GMD
textual records
Date Range
1957-1964
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
Series Number
MPE B.3.3
File Number
3
GMD
textual records
Date Range
1957-1964
Physical Description
33 cm
History / Biographical
See history/bio for sub-series B.3
Custodial History
See custodial history for sub-series B.3
Scope and Content
This box contains minutes generated by local MPE associations, collected by the central office. Records include the following: 1. Alexander 1957-1964 2. Beresford 1957-1964 3. Beulah 1957-1964 4. Bradwardine 1957-1964 5a. Brunkild 1960-1964 5b. Brunkild 1957-1960 6a. Cardale 1961-1964 6b. Cardale 1957-1961 7a. Cromer 1961-1964 7b. Cromer 1957-1961 8a. Dauphin 1961-1964 8b. Dauphin 1957-1961 9. Dunrea 1957-1964 10. Edwin 1957-1964 11a. Gladstone 1961-1964 11b. Gladstone 1957-1964
Notes
Description by Jillian Sutherland (2009)
Name Access
Manitoba Pool Elevators
Central Office
Subject Access
Local Association
Storage Location
RG 4 Manitoba Pool Elevator fonds Series B: Central Office records
Show Less

MPE B 3 Local Association minutes Box 4

http://archives.brandonu.ca/en/permalink/descriptions10021
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
GMD
textual records
Date Range
1957-1964
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
Series Number
MPE B.3.4
File Number
4
GMD
textual records
Date Range
1957-1964
Physical Description
33 cm
History / Biographical
See history/bio for sub-series B.3
Custodial History
See custodial history for sub-series B.3
Scope and Content
This box contains minutes generated by local MPE associations, collected by the central office. Records include the following: 12. Isabella 1957-1964 13a. Jordan 1960-1964 13b. Jordan 1957-1960 14. Kaleida 1957-1964 15. Lauder 1957-1964 16. La Riviere 1957-1964 17. Lyleton 1957-1964 18a. Moore Park 1960-1964 18b. Moore Park 1957-1960 19a. Napinka 1960-1964 19b. Napinka 1957-1960 20a. Nesbitt 1961-1964 20b. Nesbitt 1957-1961 21a. Ninga 1961-1964 21b. Ninga 1957-1964 22a. Pierson 1961-1964 22b. Pierson 1957-1961 23. Souris 1957-1964 24a. Sperling 1961-1964 24b. Sperling 1957-1961 25. Tilston 1957-1964 26. Waskada 1957-1964
Notes
Description by Jillian Sutherland (2009)
Name Access
Manitoba Pool Elevators
Central Office
Subject Access
Local Association
Storage Location
RG 4 Manitoba Pool Elevator fonds Series B: Central Office records
Show Less

MPE B 3 Local Association minutes Box 5

http://archives.brandonu.ca/en/permalink/descriptions10022
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
GMD
textual records
Date Range
1964-1968
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
Series Number
MPE B.3.5
File Number
5
GMD
textual records
Date Range
1964-1968
Physical Description
33 cm
History / Biographical
See history/bio for sub-series B.3
Custodial History
See custodial history for sub-series B.3
Scope and Content
This box contains minutes generated by local MPE associations, collected by the central office. Records include the following: 27. Alexander 1964-1968 28. Beresford 1964-1968 29. Beulah 1964-1968 30. Bradwardine 1964-1968 31. Cardale 1964-1968 32. Cromer 1964-1968 33. Dauphin 1964-1968 34. Dunrea 1964-1968 35. Edwin 1964-1968 36. Gladstone 1964-1968 37. Isabella 1964-1968 38. Jordan 1964-1968 39. Lauder 1964-1968 40. Lyleton 1964-1968 41. Moore Park 1964-1968 42. Napinka 1964-1968 43. Nesbitt 1964-1968 44. Ninga 1964-1968 45. Pierson 1964-1968 46. Souris 1964-1968 47. Sperling 1964-1968 48. Tilston 1964-1968 49. Waskada 1964-1968
Notes
Description by Jillian Sutherland (2009)
Name Access
Manitoba Pool Elevators
Central Office
Subject Access
Local Association
Storage Location
RG 4 Manitoba Pool Elevator fonds Series B: Central Office records
Show Less

MPE B 3 Local Association minutes Box 6

http://archives.brandonu.ca/en/permalink/descriptions10023
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
GMD
textual records
Date Range
1968-1976
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
Series Number
MPE B.3.6
File Number
6
GMD
textual records
Date Range
1968-1976
Physical Description
33 cm
History / Biographical
See history/bio for sub-series B.3
Custodial History
See custodial history for sub-series B.3
Scope and Content
This box contains minutes generated by local MPE associations, collected by the central office. Records include the following: 50a. Alexander 1972-1976 50b. Alexander 1968-1972 51a. Beresford 1972-1976 51b. Beresford 1968-1972 52a. Beulah 1973-1977 52b. Beulah 1968-1973 53a. Bradwardine 1972-1976 53b. Bradwardine 1968-1972 54a. Brunkild 1966-1968 54b. Brunkild 1964-1966 55a. Cardale 1975-1976 55b. Cardale 1972-1974 55c. Cardale 1968-1972 56a. Cromer 1974-1976 56b. Cromer 1972-1974 56c. Cromer 1968-1971 57a. Dauphin 1972-1976 57b. Dauphin 1968-1972 58a. Dunrea 1973-1976 58b. Dunrea 1968-1973 59a. Edwin 1973-1976 59b. Edwin 1968-1972 60a. Gladstone 1973-1976 60b. Gladstone 1968-1972 61. Glenella 1968-1972 62. Glenora 1968-1976
Notes
Description by Jillian Sutherland (2009)
Name Access
Manitoba Pool Elevators
Central Office
Subject Access
Local Association
Storage Location
RG 4 Manitoba Pool Elevator fonds Series B: Central Office records
Show Less

MPE B 3 Local Association minutes Box 8

http://archives.brandonu.ca/en/permalink/descriptions10024
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
GMD
textual records
Date Range
1977-1989
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
Series Number
MPE B.3.8
File Number
8
GMD
textual records
Date Range
1977-1989
Physical Description
33 cm
History / Biographical
See history/bio for sub-series B.3
Custodial History
See custodial history for sub-series B.3
Scope and Content
This box contains minutes generated by local MPE associations, collected by the central office. Records include the following: 79a. Cromer 1978-1980 79b. Cromer 1977-1978 80a. Dauphin 1977-1978 80b. Dunrea 1977-1980 81a. Gladstone March 1 1979 – Nov 24 1980 81b. Gladstone Feb 2 1977 – Jan 17 1979 82. Edwin Jan 10 1977 – March 3 1981 83a. Isabella Feb 4 1977 – August 28 1980 83b. Lauder April 20 1979 – Nov 13 1980 84. Lyleton Dec 13 1977 – Nov 24 1978 85a. Jordan April 2 1979 – Dec 11 1980 85b. Jordan Jan 31 1977 – Feb 26 1979 86. Moore Park Jan 4 1977 – April 11 1979 87a. Napinka Jan 17 1977 – Nov 14 1980 87b. Nesbitt Feb 8 1979 – Nov 27 1980 87c. Nesbitt Jan 6 1977 – Dec 18 1978 87d. Ninga Feb 16 1977 – July 28 1980 88a. Pierson Dec 20 1978 – Nov 26 1980 88b. Pierson Jan 20 1977 – Dec 20 1978 89a. Souris Jan 10 1975 – Nov 30 1976 89b. Sperling May 8 1978 – Dec 10 1980 89c. Sperling March 21 1977 – Jan 31 1979 90. Tilston June 9 1977 – Nov 16 1978 91. Waskada Jan 10 1977 – Dec 12 1980 92. Bradwardine Feb 11 1981 – Nov 16 1981 93. Cromer Jan 13 1981 – Nov 27 1981 94a. Dunrea Sept 23 1985 – Nov 27 1989 94b. Dunrea March 24 1981 – Feb 14 1985 95a. Beresford July 31 1986 – Nov 14 1986 95b. Beresford Jan 13 1981 – April 3 1986 96a. Gladstone Nov 19 1986 – Nov 28 1989 96b. Gladstone Nov 3 1983 – Oct 11 1986 96c. Gladstone Jan 23 1981 – Jan 4 1984
Notes
Description by Jillian Sutherland (2009)
Name Access
Manitoba Pool Elevators
Central Office
Subject Access
Local Association
Storage Location
RG 4 Manitoba Pool Elevator fonds Series B: Central Office records
Show Less

MPE B 3 Local Association minutes Box 9

http://archives.brandonu.ca/en/permalink/descriptions10025
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
GMD
textual records
Date Range
1975-1989
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
Series Number
MPE B.3.9
File Number
9
GMD
textual records
Date Range
1975-1989
Physical Description
33 cm
History / Biographical
See history/bio for sub-series B.3
Custodial History
See custodial history for sub-series B.3
Scope and Content
This box contains minutes generated by local MPE associations, collected by the central office. Records include the following: 97. Isabella Jan 28 1981 – July 21 1981 98a. Jordan Oct 23 1984 – Oct 6 1989 98b. Jordan Nov 8 1982 – Oct 3 1984 98c. Jordan Jan 15 1981 – Sept 27 1982 99. Lauder April 21 1981 – March 28 1983 100. Napinka Jan 12 1981 – Oct 28 1985 101. Nesbitt Jan 5 1981 – Nov 24 1982 102a. Pierson Sept 21 1987 – Dec 20 1989 102b. Pierson Sept 21 1983 – April 16 1987 102c. Pierson Jan 9 1981 – June 23 1983 103a. Sperling Jan 8 1987 – Nov 20 1989 103b. Sperling Dec 8 1983 – Jan 8 1987 103c. Sperling Feb 4 1981 – Dec 8 1983 104a. Waskada Sept 12 1984 – Nov 29 1989 104b. Waskada Jan 5 1981 – July 24 1984 105. Dominion City Oct 28 1987 – July 30 1990 106. Fannystelle March 5 1987 – Feb 19 1990 107. Minto Feb 17 1987 – Feb 27 1989 108. Poplar Point Jan 22 1987 – Jan 9 1991 109. Rathwell Feb 5 1987 – March 6 1990 110. Riverton August 5 1983 – Oct 29 1990 111. Silverton Nov 10 1987 – Jan 1990 112a. Brunkild Feb 5 1992 – Nov 29 1993 112b. Brunkild Jan 8 1990 – Jan 8 1992 113a. Brunkild Oct 6 1986 – Dec 11 1989 113b. Brunkild May 18 1984 – Sept 2 1986 113c. Brunkild Jan 5 1981 – Feb 6 1984 114a. Brunkild Dec 4 1978 – Dec 8 1980 114b. Brunkild Jan 4 1977 – Nov 29 1978 114c. Brunkild Jan 6 1975 – Dec 5 1976
Notes
Description by Jillian Sutherland (2009)
Name Access
Manitoba Pool Elevators
Central Office
Subject Access
Local Association
Storage Location
RG 4 Manitoba Pool Elevator fonds Series B: Central Office records
Show Less

MPE B 3 Local Association minutes Box 10

http://archives.brandonu.ca/en/permalink/descriptions10026
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
GMD
textual records
Date Range
1968-1998
Part Of
RG 4 Manitoba Pool Elevator fonds
Description Level
Box
Series Number
MPE B.3.10
File Number
10
GMD
textual records
Date Range
1968-1998
Physical Description
13 cm
History / Biographical
See history/bio for sub-series B.3
Custodial History
See custodial history for sub-series B.3
Scope and Content
This box contains minutes generated by local MPE associations, collected by the central office. Records include the following: 115a. Brunkild Nov 28 1972 – Dec 2 1974 115b. Brunkild Oct 29 1970 – Nov 8 1972 115c. Brunkild Nov 14 1968 – Nov 9 1970 116a. Beresford Feb 19 1992 – May 13 1998 116b. Beresford August 17 1992 – Dec 14 1991 117. Dunrea Jan 12 1990 – May 31 1993 118a. Jordan Feb 11 1994 – May 27 1996 118b. Jordan Nov 21 1989 – Nov 25 1993
Notes
Description by Jillian Sutherland (2009)
Name Access
Manitoba Pool Elevators
Central Office
Subject Access
Local Association
Storage Location
RG 4 Manitoba Pool Elevator fonds Series B: Central Office records
Show Less

20 records – page 2 of 1.