Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Co-enerco was a co-operative energy company that resulted from the Co-operative Resources Project.
See also fonds level description of RG 4 for history/bio of MPE
Scope and Content
This sub-series consists of records pertaining to the formation of Co-enerco.
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put a negative in the envelope and taped the print to the outside. We have separated them and numbered the negative D13(1) and the print D13(1a).]
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put a negative in the envelope and taped the print to the outside. We have separated them and numbered the negative D13(1) and the print D13(1a).]
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant.
Notes
Writing on the back of the photograph reads: "10 mile dam". Biographical information obtained from Manitoba Historical Society.
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant. The dam's timber construction is quite evident in the picture.
Notes
Writing on the back of the photograph reads: McGuinness (Manitoba Hydro), on Little Saskatchewan.
Built in 1991-1992 for $1.4 million, the official opening of the Centre was May 29, 1992. The centre is currently (April 2010) called the Addictions Foundation of Manitoba, Parkwood Centre.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Alcoholism Foundation of Manitoba (AFM), Parkwood Treatment Centre located on Victoria Avenue East.
Built in 1991-1992 for $1.4 million, the official opening of the Centre was May 29, 1992. The centre is currently (April 2010) called the Addictions Foundation of Manitoba, Parkwood Centre.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Alcoholism Foundation of Manitoba (AFM), Parkwood Treatment Centre.
The Canadian Union of Public Employees came into existence in September 1963, during a convention in Winnipeg when The National Union of Public Employees and the National Union of Public Service Employees merged. In 1964, the Manitoba Division of CUPE (now CUPE Manitoba) held its founding convention in The Pas. At that time, there were 12 affiliated local unions and a total membership of 1,300. The Canadian Union of Public Employees is Canada's largest union. Public service employees formed CUPE to protect their rights, to negotiate wages and working conditions, and to achieve dignity in the workplace.
Custodial History
Fonds was in the possesssion of the Brandon CUPE Office until its donation to the S.J. McKee Archives in 1995.
Scope and Content
Fonds contains general administrative files of the CUPE including agreements, newspaper clippings, correspondence, and convention records. In addition, fonds includes records for many CUPE locals in southwestern and north-central Manitoba. These includes files for each local containing agreements, lists of officials, correspondence and financial records. An extensive body of records dating from 1956 exists for CUPE local #69. This local began its existence as the Brandon Civic Employees Federal Union formed in April 1919.