Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
Located about 10 miles west of Brandon on the Little Saskatchewan River, this dam was the first hydroelectric generating station in operation in western Canada. It began supplying power to the city in 1901. This power source, which could not operate in winter, was supplemented by the steam plant on 10th St. By about 1920 the steam plant had been greatly expanded and the hydroelectric plant closed. The old dam was washed out due to a thunder storm in 1948.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Original Hydroelectric Dam belonging to Brandon Light & Power Co.
Notes
[Mr. Stuckey put two negatives (with two views each) in one envelope, numbering each view J3b through J3e. We have separated them.]
In 1917 the Brandon Electric Light Co. and the Brandon Gas & Power Co. merged to form the Canada Gas & Electric Company; CG&EC was subsequently taken over by the Manitoba Power Commission;
Brandon's central heating system was taken over by the Brandon Steam Heat Users Co-operative;
On September 13, 1957 at 3:38 PM, an explosion in the boiler and stack destroyed the large stack causing two fatalities.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Canada Gas & Electric Co. steam plant
Notes
View (from 10th St.) of the coal-powered steam generating plant located at 10th St. & Lorne Ave.
Copy negative from 8x10 negative by C.J. Smith (on file).
In 1917 the Brandon Electric Light Co. and the Brandon Gas & Power Co. merged to form the Canada Gas & Electric Company; CG&EC was subsequently taken over by the Manitoba Power Commission;
Brandon's central heating system was taken over by the Brandon Steam Heat Users Co-operative;
On September 13, 1957 at 3:38 PM, an explosion in the boiler and stack destroyed the large stack causing two fatalities.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Canada Gas & Electric Co. steam plant
Notes
Rear view of the coal-powered steam generating plant located at 10th St. & Lorne Avenue
Coal was fed from boxcars up elevators to crushers in two cupolas from which it was fed by gravity to chain grate boilers; The chain grate revolved slowly but constantly with coal fed at front edge, burned, and dumped as cinders in pit at far end
The two boxcars shown were used to haul the coal; One is lettered for the Canadian National, the other is still lettered for the merged Grand Trunk Pacific; Cinders were loaded in gondola cars at far right
Copy negative from 8x10 negative by C.J. Smith (on file).
Excavated earth was loaded into a hopper, which itself was on a rail running a half block back. It was then dumped back to fill the trench where pipe installation had already been completed - Art Baker (of Art's Confectionery, NE 15th St. & Princess Ave.). This information was provided in response to a request in the Brandon Sun (Fred McGuinness) for further information.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Brandon sewer line construction
Notes
View of Pacific Avenue, looking east from 5th Street
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put a negative in the envelope and taped the print to the outside. We have separated them and numbered the negative D13(1) and the print D13(1a).]
The McKee Archives is the copyright holder for the Stuckey materials.
Storage Location
Lawrence Stuckey collection
Arrangement
[Mr. Stuckey put a negative in the envelope and taped the print to the outside. We have separated them and numbered the negative D13(1) and the print D13(1a).]
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant.
Notes
Writing on the back of the photograph reads: "10 mile dam". Biographical information obtained from Manitoba Historical Society.
Situated in the R.M. of Whitehead on the Little Saskatchewan River, the 10 Mile Dam was a 14 kilometer transmission line that supplied the city of Brandon with power. The Brandon Electric Light Company built the dam in 1900 and it is considered Manitoba's first hydroelectic power generating station. The dam spanned approximately 80 meters and was constructed from timber and reinforced with clay and stone. The station was decommissioned in 1924.
Scope and Content
Photograph shows 10 Mile Dam, also known as the Brandon Dam or Minnedosa River Hydro Plant. The dam's timber construction is quite evident in the picture.
Notes
Writing on the back of the photograph reads: McGuinness (Manitoba Hydro), on Little Saskatchewan.
Built in 1991-1992 for $1.4 million, the official opening of the Centre was May 29, 1992. The centre is currently (April 2010) called the Addictions Foundation of Manitoba, Parkwood Centre.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Alcoholism Foundation of Manitoba (AFM), Parkwood Treatment Centre located on Victoria Avenue East.
Built in 1991-1992 for $1.4 million, the official opening of the Centre was May 29, 1992. The centre is currently (April 2010) called the Addictions Foundation of Manitoba, Parkwood Centre.
Custodial History
For custodial history see the collection level description of the Lawrence Stuckey collection.
Scope and Content
Alcoholism Foundation of Manitoba (AFM), Parkwood Treatment Centre.